| Payment Terms | T/T, Western Union |
| Supply Ability | 10Ton/Month |
| Delivery Time | 15-30 Workdays |
| Packaging Details | Standard Shipping Package |
| Brand Name | TOBO |
| Model Number | Coated Steel Pipe |
| Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai, China |
View Detail Information
Explore similar products
1 / 2 - 8 " SCH 40 Powder Coated Steel Pipe Q195-Q345 ST35-ST52
Fusion Bonded Epoxy Coated Steel Pipe Seamless API Steel Tube With DIN30670
Powder Coated Steel Tube API 5L GRADE X42 MS PSL2 3LPE 1.8 - 22 Mm Thickness
Sch40 Coated Stainless Steel Tubing
Product Specification
| Payment Terms | T/T, Western Union | Supply Ability | 10Ton/Month |
| Delivery Time | 15-30 Workdays | Packaging Details | Standard Shipping Package |
| Brand Name | TOBO | Model Number | Coated Steel Pipe |
| Certification | ISO/TUV/SGS | Place of Origin | Shanghai, China |
| High Light | ASME standard coated steel pipes ,corrosion resistant steel pipes ,TOBO coated steel pipes | ||
TOBO Coated Steel Pipes with Superior Corrosion Resistance (ASME Standard)
TOBO Coated Steel Pipes are designed to deliver outstanding long‑term protection against corrosion, abrasion and chemical attack in harsh operating environments. Manufactured in accordance with ASME standards to guarantee material and dimensional stability, these pipes integrate the inherent strength of carbon or alloy steel with advanced protective coating technologies. This combination greatly prolongs the service life of piping systems, lowers maintenance requirements, and provides an economical solution to prevent infrastructure deterioration. They are ideal for buried, submerged or exposed industrial applications, delivering stable performance where uncoated steel would quickly corrode or fail.
1. Product Description
TOBO Coated Steel Pipes are based on high‑quality steel pipes (seamless or welded) that receive thorough surface treatment before being applied with professional protective coatings. Our product portfolio includes various coating systems including Fusion‑Bonded Epoxy (FBE), 3‑Layer Polyethylene (3LPE), 3‑Layer Polypropylene (3LPP) and heavy‑duty anti‑corrosion coatings. Each coating type is carefully selected to form a strong, well‑bonded and continuous barrier customized for specific environmental conditions, operating temperatures and project requirements.
2. Key Specifications
Base Pipe Standards: ASME B36.10M, ASTM A106 Gr. B, API 5L
Coating Standards: ISO 21809, AWWA C210, CAN/CSA‑Z245.20/21
Coating Types: FBE (single/dual layer), 3LPE, 3LPP, Concrete Weight Coating (CWC)
Size Range: 2” to 48” O.D. and larger
Temperature Resistance: Generally from -30°C up to over 110°C (varies by coating type)
3. Applications
These pipes are widely used in projects where corrosion control is critical for safety and cost efficiency:
Oil & Gas: Onshore/offshore transmission pipelines, gathering lines, water injection lines
Water & Wastewater: Drinking water pipelines, pressure sewers, intake and discharge lines
Chemical & Industrial: Underground piping, cooling water systems, effluent pipelines
Infrastructure & Piling: Bridge, port and building piles exposed to soil or water
Mining & Slurry: Abrasion‑resistant lined pipes for slurry transportation
4. Key Advantages
Excellent Anti‑Corrosion Performance: Provides high electrical insulation and strong resistance to moisture, chemicals and soil stress, effectively slowing corrosion.
Superior Mechanical Protection: Coatings such as 3LPE/3LPP offer high impact resistance and good cathodic disbondment performance, preventing damage during transportation and installation.
Long Service Life & Low Operating Cost: Extend pipeline life by decades, reduce repair, replacement and downtime costs.
Improved Flow Efficiency: Smooth internal coatings reduce friction loss, increase delivery capacity and lower pumping energy consumption.
Customizable Solutions: Coating type and thickness can be adjusted to match soil conditions, temperature and exposure environment.
5. Function
The main function of TOBO Coated Steel Pipes is to protect the steel base material from degradation, ensuring the structural and operational integrity of the pipeline throughout its design life. They act as a key protective layer, isolating the pipe from corrosive surroundings, reducing the risk of leakage or failure, and enabling safe, continuous and cost‑effective transportation of oil, gas, water and other media.
Payment & Invoicing
First-Time Clients: 50% advance payment, 50% balance before shipment.
Strategic Clients: 30% advance, 70% payment against copy of Bill of Lading.
Long-Term Agreements: 60-day credit terms available (subject to credit approval).
Invoicing: 13% VAT Special Invoice provided; FORM A Certificate of Origin for exports.
fication System: Laser marking includes material code, pressure rating, and flow direction arrows.
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the Alibaba certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
![]()
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
3,000,000-10,000,000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicia...
Get in touch with us
Leave a Message, we will call you back quickly!