Communication Mode | Full-Duplex & Half-Duplex |
Transmission Rate | 100Gbps |
Function | LACP, POE, QoS, SNMP, Stackable, VLAN Support |
Switch Capacity | 100T |
Ports | 16 |
Product name | Huawei ES1D2MCUD000-S7703/S7703 PoE Main Control Unit D |
Products Status | Stock |
Brand Name | Huawei |
Model Number | S7700 |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
Huawei Network Switches CE6881-48S6CQ 48*10G SFP+ 6*100G QSFP28 Without Fan And
S5700-26X-SI-12S-AC Huawei Network Switches 12 X Gig SFP 2 X 10 Gig SFP+,256
BC1M23EC05 Huawei RH Series Rack Servers RH 2288 V3 Server 2*E5-2618L
S6730-H24X6C Huawei Network Switch 24x10G SFP+ Ports 6*40GE/100GE QSFP28 Ports
Product Specification
Communication Mode | Full-Duplex & Half-Duplex | Transmission Rate | 100Gbps |
Function | LACP, POE, QoS, SNMP, Stackable, VLAN Support | Switch Capacity | 100T |
Ports | 16 | Product name | Huawei ES1D2MCUD000-S7703/S7703 PoE Main Control Unit D |
Products Status | Stock | Brand Name | Huawei |
Model Number | S7700 | Certification | CE |
Place of Origin | China | ||
High Light | Huawei S7700 Series Switches ,Huawei S7700 Smart Routing Switch ,S7700 PoE Main Control Unit D |
Huawei S7700 Series Switches ES1D2MCUD000 - S7703 / S7703 PoE Main Control Unit D
Switch chassis and software versions matching the card
Card Name | S7700 Chassis |
---|---|
ES1D2MCUD000 | S7703 chassis: supported in V200R013C00SPC500, V200R013C01, and later versions S7703 PoE chassis: supported in V200R013C00SPC500 and later versions S7706, S7706 PoE, and S7712 chassis: not supported |
The ES1D2MCUD000 can be installed in slots 04 and 05 in an S7703 or S7703 PoE chassis.
The ES1D2MCUD000 is the main control unit of the S7703/S7703 PoE. It integrates the control unit and system maintenance unit, and provides the following functions:
Function | Description |
---|---|
Basic function | Integrates the main control unit and system maintenance unit. |
Memory | 2 GB |
Flash | Nand flash: 2 GB |
Redundancy backup | Supported Main control board is mandatory for switches. Each switch must be configured with one or two main control boards. When one main control board is configured for a switch, the main control board can be installed in either main control board slot of the switch. When two main control boards are configured, the two main control boards work in hot standby mode to improve reliability of the switch. The active and standby main control boards monitor the status of each other. If the active main control board fails, the standby main control board automatically becomes active to ensure uninterrupted services. |
Hot swapping | Supported Before removing the active ES1D2MCUD000 card, perform an active/standby switchover. |
Company Details
Business Type:
Distributor/Wholesaler,Agent,Seller
Year Established:
2007
Total Annual:
2,000,000-4,000,000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
The Formation of Lonrise My Company was founded in 2007 as Cisco distributor and integrator domestically. After 4 years' steadfast development, it spotted the business abroad. Thus Lonrise stepped on the road as a global CISCO supplier which has owned a good reputation within ... The Formation of Lonrise My Company was founded in 2007 as Cisco distributor and integrator domestically. After 4 years' steadfast development, it spotted the business abroad. Thus Lonrise stepped on the road as a global CISCO supplier which has owned a good reputation within ...
Get in touch with us
Leave a Message, we will call you back quickly!