| Payment Terms | L/C, T/T, Western Union, MoneyGram |
| Delivery Time | 30 -45 days |
| Packaging Details | Wooden Case Wrapped Loaded in Container |
| Roller Material | Carbon/stainless steel,Aluminum alloy or other specified material |
| Surface Treatment | Trivalent chromium galvanized, Chrome, Paint, Anodized, Teflon Spray |
| Face Length | 2500-9000mm |
| Operating Speed | 2200m/min |
| Feature | High-quality and Efficient |
| Diameter | 350-900mm |
| Certification | CE; ISO9001 |
| Place of Origin | Qinyang City,Henan |
View Detail Information
Explore similar products
Dryer Cylinder 3000mm HT250 Paper Machine Spare Parts
Vacuum Foil 3.86g/Cm3 15Gpa Paper Plate Machine Parts
Suction Roll 25mm 64% Paper Machine Spare Parts
Air Cushioned 300m/Min 220mm Paper Machine Spare Parts
Product Specification
| Payment Terms | L/C, T/T, Western Union, MoneyGram | Delivery Time | 30 -45 days |
| Packaging Details | Wooden Case Wrapped Loaded in Container | Roller Material | Carbon/stainless steel,Aluminum alloy or other specified material |
| Surface Treatment | Trivalent chromium galvanized, Chrome, Paint, Anodized, Teflon Spray | Face Length | 2500-9000mm |
| Operating Speed | 2200m/min | Feature | High-quality and Efficient |
| Diameter | 350-900mm | Certification | CE; ISO9001 |
| Place of Origin | Qinyang City,Henan | ||
| High Light | 1500mm paper cup machine parts ,0.8MPa paper cup machine parts ,1500mm paper plate machine parts | ||
High Performance Rubber Coated Guide Roll For Paper Making Machine Spare Parts
Product Description
Guide Roll is used in paper, textile, printing and dyeing, iron and steel industry, from the drive guide, material selection, high-quality, seamless, roller surface coated rubber, composite, Copper or Chrome.
![]()
Detailed Images
| Diameter(mm) | Design pressure (MPa) | Material | Hardness(HB) | Face length(mm) |
| 1500 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
| 1800 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
| 2000 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
| 2500 | 0.3-0.8 | HT250-300 | 190-240 | 350-10000 |
Packaging
1. Fixed all the movable parts with plastic films.
2. Polystyrene foam plate wrapped around.
3. Wrapped with tighted plastic films several circles.
4. Fixed machine on the fumigated plywood pallet with iron wire.
5. Wrapped with wooden board around and nailed on.
Shipping
1. Shipment can be by sea, by train, by truck;
2. Delivery Time: within 40 days after first payment or L/C.
FAQ
Q: What's your Advantage? Why shall we choose your Company?
A: We have the most professional techniques and team, according to the customer requirements, we supports customized machine.
A: We are a professional manufacturer and warmly welcome clients from worldwide to visit our factory and cooperate with us.
Q: How about is the warranty of the Spare Parts?
A: One year warranty except the consuming spare parts.
Q: What is the Service?
A: 7 days 24 hours on line service, engineer oversea service is also available if necessary.
Q: What is the Delivery Time?
A: 45 working days after the confirmation of the order.
Q: What's the payment terms?
A: T/T would be better with quick transfer and few bank fees,30% deposit, balance before shipment.
Company Details
Business Type:
Manufacturer
Year Established:
1989
Total Annual:
30000000-50000000
Employee Number:
100~200
Ecer Certification:
Active Member
*********************** WHO WE ARE ********************  ... *********************** WHO WE ARE ********************  ...
Get in touch with us
Leave a Message, we will call you back quickly!