Payment Terms | T/T,paypal,trade assurance |
Supply Ability | 1000 PCS/month |
Delivery Time | Within 2 working days |
Packaging Details | Standard shipping package |
Model | PC200-8MO PC300-5 PC300-8 PC400-5 |
Part name | komatsu excavator idler assy |
Application | excavator |
part name | excavator idler assy |
Type | excavator parts |
Quality | New |
Brand | ZW |
color | According to customer requirement |
Brand Name | excavator sprocket |
Model Number | PC200-8MO PC300-5 PC300-8 PC400-5 |
Place of Origin | China |
View Detail Information
Explore similar products
Excavator spare parts SK60-8 Sk200 sk450 PC300-5 PC56 PC60 EX200 ZAX55 for
Komatsu PC40 PC55 pc60 PC100-5 PC200-3 PC200-5 excavator idler assy for
Excavator spare parts Komatsu PC200-8MO PC300-5 PC300-8 PC400-5 excavator idler
Hitachi EX100-1 EX100-3 EX200-5 hitachi excavator idler assy ZAX200 EX300-1
Product Specification
Payment Terms | T/T,paypal,trade assurance | Supply Ability | 1000 PCS/month |
Delivery Time | Within 2 working days | Packaging Details | Standard shipping package |
Model | PC200-8MO PC300-5 PC300-8 PC400-5 | Part name | komatsu excavator idler assy |
Application | excavator | part name | excavator idler assy |
Type | excavator parts | Quality | New |
Brand | ZW | color | According to customer requirement |
Brand Name | excavator sprocket | Model Number | PC200-8MO PC300-5 PC300-8 PC400-5 |
Place of Origin | China |
Excavator spare parts EX55 EX60-1 EX60-2 EX70 for hitachi excavator idler assy
Product Parameters
Part Name | excavator idler assy |
Model | EX55 EX60-1 EX60-2 EX70 |
Part name | komatsu excavator idler assy |
Size | Standard |
Application | Excavator, Engineering machinery equipment |
Packing | Wooden Case |
Warranty | 6 Months |
Color | According to customer requirement |
OEM | Acceptable |
MOQ | 1 Sets |
Payment Terms | TT/Paypal |
Port | Guangzhou Huangpu |
Delivery Time | 3-7 Days |
The excavator idler wheel, also known as the guide wheel or tensioning wheel, is a critical component of the excavator’s undercarriage system. Positioned at the front of the track frame, it works in tandem with the track chain, sprocket, and carrier rollers to guide the track’s movement and maintain proper tension. Its performance directly impacts the excavator’s stability, maneuverability, and overall operational efficiency.
Structural Components
Wheel Body: Typically forged or cast from high-strength steel, the wheel body is designed for exceptional wear and impact resistance. Surface treatments such as quenching or carburizing enhance its hardness and durability.
Bearings: High-precision rolling bearings are installed inside the wheel body to support smooth rotation under heavy loads.
Seals: Advanced sealing systems prevent contaminants (e.g., dirt, moisture) from entering the bearing assembly, ensuring long-term lubrication and functionality.
Mounting Hardware: Bolts and brackets securely attach the idler wheel to the track frame, with torque specifications strictly followed to guarantee structural integrity.
Excavators are widely used in the following fields:
Construction engineering: used for earthwork excavation, foundation treatment, etc.
Mining: The extraction of resources such as ore and coal.
Road construction: roadbed excavation, pipeline laying, etc.
Water conservancy engineering: river dredging, dam construction, etc.
Municipal engineering: pipeline laying, greening construction, etc.
Agriculture: land leveling, ditch excavation, etc.
Emergency rescue: clearing ruins, clearing roads, etc.
Maintenance and upkeep
Regular inspection: Check the wear of the guide wheel rim and replace severely worn components in a timely manner.
Lubrication and maintenance: Regularly add lubricating grease to the bearings to ensure smooth rotation of the wheel body.
Cleaning: Timely clean the dirt, gravel and other debris on the guide wheel to prevent them from entering the bearing and causing damage.
Check the tension: Regularly check the tension of the track to ensure it is in the appropriate state and avoid being too loose or too tight.
FAQ:
1. What is the warranty time of the products?
The warranty time is 6/12 months based on the item details; We don't provide warranty time for original and used products.
2.What is your delivery time?
Generally, we will arrange the goods within 24 hours after your payment; if not in stock, stocking time is 1-7 days.
3..How can I do if there is something wrong with the goods?
First at all, we have confidence in the quality of our products, if you really found something wrong, please provide pictures or video for us and we will check. After it is confirmed, please return the goods to us and we will offer the correct item.
4.How do I pay?
You can pay by T/T,PayPal (for small amount) and Alibaba trade assurance.
Company Details
Year Established:
2013
Total Annual:
9000000-12000000
Employee Number:
60~100
Ecer Certification:
Verified Supplier
Our main products are Excavator Hydraulic spare parts, Hydraulic pump, Swing motor, Travel motor, Final drive, Swing gearbox, Travel gearbox, Control valve,Monitor,Controller, Hydraulic cylinder and other hydraulic items with genuine and aftermarket quality. Until now, our products enjoy high reputa... Our main products are Excavator Hydraulic spare parts, Hydraulic pump, Swing motor, Travel motor, Final drive, Swing gearbox, Travel gearbox, Control valve,Monitor,Controller, Hydraulic cylinder and other hydraulic items with genuine and aftermarket quality. Until now, our products enjoy high reputa...
Get in touch with us
Leave a Message, we will call you back quickly!