China factories

China factory - Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101
China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101

  1. China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101
  2. China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101
  3. China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101
  4. China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101
  5. China PC400-5 6D125 Diesel Cylinder Head 6151-11-1101

PC400-5 6D125 Diesel Cylinder Head 6151-11-1101

  1. MOQ: 1 set
  2. Price: Looking forward to your inquiry
  3. Get Latest Price
Payment Terms T/T, Western Union, MoneyGram,HSBC
Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days
Packaging Details Plastic bag , Box , Carton
After Warran Online support
OEM Service Available
Packing Plastic bag , Box , Carton
Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel
introduce High precision steel pipe materials
advantage Improve surface roughness
Brand Name HDPARTS
Model Number PC400-5 6D125
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union, MoneyGram,HSBC Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days Packaging Details Plastic bag , Box , Carton
After Warran Online support OEM Service Available
Packing Plastic bag , Box , Carton Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel introduce High precision steel pipe materials
advantage Improve surface roughness Brand Name HDPARTS
Model Number PC400-5 6D125 Place of Origin China
High Light 6D125 Diesel Cylinder HeadPC400-5 Diesel Cylinder HeadDiesel Cylinder Head 6151-11-1101

PC400-5 6D125 Diesel Cylinder Head 6151-11-1101

Specification

Applicable models

PC400-5 6D125

Type Cylinder Head
Original number 6151-11-1101
Warranty 6 months
Engine Type  Diesel
Brand Name  HDPARTS
Condition  New
Size  OEM Size

 

Cylinder cracking edit broadcastThe temperature is low in winter, and the cylinder head of diesel engine is prone to cracks and water leakage. The main reasons are as follows:1. Add cooling water after starting. After the diesel engine is started, the temperature inside the engine rises immediately. If cooling water is added at this time, the cylinder block and cylinder head will cool down rapidly, and cracks will occur due to cold shrinkage.2. After shutting down, there is no cooling water. The water in the engine freezes into ice, the volume increases, and the cylinder block and cylinder head burst.3. When the diesel engine is running, the cooling water is insufficient or the temperature of the water tank is too high, and the cooling water is suddenly added. Cracking can also be caused by overcooling and shrinkage of the cylinder block and cylinder head.4. The diesel engine runs for a long time, the temperature inside the engine is high, and the high-temperature water is released immediately after parking. It will cause high temperature parts to crack when they encounter cold air suddenly.5. Use the decompression machine to stop, so that the high temperature cylinder head suddenly encounters cold air and causes cracking.There are the following methods to prevent cracking of various cylinder blocks and cylinder heads:1. Before starting the diesel engine, warm water should be added to the water tank. In the severe winter season, the hot water should be poured 2~3 times. It is better to start when the water flowing out of the drain valve is about 30~50℃.2. When the diesel engine has been running for a long time, wait for about half an hour after stopping, and then release the cooling water when the engine temperature drops to 40~50°C. After draining the water, it is best to poke through the drain valve switch with a thin iron wire to prevent sediment from clogging the drain valve.3. When the diesel engine is overheated and seriously lacks water, let the diesel engine idle at low speed for 10-15 minutes, and then slowly add cooling water

 

 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1998

  • Total Annual:

    99999-1999999

  • Employee Number:

    80~120

  • Ecer Certification:

    Verified Supplier

Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
  • Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
  • https://www.parts-hd.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement