Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
introduce | High precision steel pipe materials |
advantage | Improve surface roughness |
Brand Name | HDPARTS |
Model Number | 4JG1 |
Place of Origin | China |
View Detail Information
Explore similar products
K25 Engine Cylinder Liner Nissan Diesel Engine Spare Parts
4JX1 4JK1 Diesel Engine Cylinder liner 8-97176-699-0 For ISUZU
S6A Cylinder Liner 32507-12100 For Mitsubi Engine
3AB1 Diesel Engine Cylinder Liner 9-11261-230-0 For ISUZU
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | introduce | High precision steel pipe materials |
advantage | Improve surface roughness | Brand Name | HDPARTS |
Model Number | 4JG1 | Place of Origin | China |
High Light | 4JG1 Diesel Engine Cylinder Liner ,8-97176-699-0 Diesel Engine Cylinder Liner |
4JG1 Diesel Engine Cylinder Liner 8-97176-699-0 For ISUZU
Specification
Applicable models | 4JG1 |
Type | Cylinder liner |
Original number | 8-97176-699-0 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Wet cylinder liner
The wall thickness of the outer surface in direct contact with the cooling water is generally 5-9mm.
Features: There is no closed water jacket on the cylinder block, making it easy to cast, easy to repair and replace, and has good heat dissipation effect.
Disadvantages: The stiffness of the cylinder block is poor, prone to pitting, air leakage, water leakage, poor lifespan, and poor sealing. |
Dry cylinder liner
The outer surface of the dry cylinder liner does not directly come into contact with the coolant, and its wall thickness is 1-3mm to ensure heat dissipation and cylinder liner positioning. The outer surface of the cylinder liner and the inner surface of the cylinder liner hole in the cylinder block have high machining accuracy, and a certain amount of interference is used to fit the cylinder into the cylinder liner hole.
Features: Not prone to water leakage, small distance between leaking cylinder centers, compact structure, good structural stiffness of cylinder body, long service life, and no contact with coolant.
Disadvantages: Poor heat dissipation and inconvenient maintenance and replacement. Mainly used for small engines. |
Product Description
,
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!