Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
introduce | High precision steel pipe materials |
advantage | Improve surface roughness |
Brand Name | HDPARTS |
Model Number | 4HK1 |
Place of Origin | China |
View Detail Information
Explore similar products
K25 Engine Cylinder Liner Nissan Diesel Engine Spare Parts
4JX1 4JK1 Diesel Engine Cylinder liner 8-97176-699-0 For ISUZU
S6A Cylinder Liner 32507-12100 For Mitsubi Engine
3AB1 Diesel Engine Cylinder Liner 9-11261-230-0 For ISUZU
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | introduce | High precision steel pipe materials |
advantage | Improve surface roughness | Brand Name | HDPARTS |
Model Number | 4HK1 | Place of Origin | China |
High Light | Diesel Engine Cylinder Liner 1-87618212-0 ,8-94391603-0 Diesel Engine Cylinder Liner ,8-94391602-1 Diesel Engine Cylinder Liner |
4HK1 Diesel Engine Cylinder Liner 1-87618212-0 8-94391-602-0 8-94391603-0 8-94391602-1 For ISUZU
Specification
Applicable models | 4HK1 |
Type | Cylinder liner |
Original number | 1-87618212-0 8-94391-602-0 8-94391603-0 8-94391602-1 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
1) Poor lubrication conditions cause severe wear on the upper part of the cylinder liner. The upper part of the cylinder liner is adjacent to the combustion chamber, with high temperature and poor lubrication conditions. The erosion and dilution of fresh air and non evaporated fuel exacerbates the deterioration of the upper conditions, causing the cylinder to be in a dry or semi dry friction state, which is the cause of severe wear on the upper part of the cylinder.
2) The upper part bears a large amount of pressure, causing the cylinder to wear slightly from top to bottom. The piston ring is pressed against the cylinder wall under its own elastic force and back pressure. The greater the positive pressure, the more difficult it is to form and maintain the lubricating oil film, and the mechanical wear intensifies. During the power stroke, as the piston descends, the positive pressure gradually decreases, resulting in a heavier wear on the cylinder. |
Product Description
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!