Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
introduce | High precision steel pipe materials |
advantage | Improve surface roughness |
Brand Name | HDPARTS |
Model Number | C221 |
Place of Origin | China |
View Detail Information
Explore similar products
K25 Engine Cylinder Liner Nissan Diesel Engine Spare Parts
4JX1 4JK1 Diesel Engine Cylinder liner 8-97176-699-0 For ISUZU
S6A Cylinder Liner 32507-12100 For Mitsubi Engine
3AB1 Diesel Engine Cylinder Liner 9-11261-230-0 For ISUZU
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | introduce | High precision steel pipe materials |
advantage | Improve surface roughness | Brand Name | HDPARTS |
Model Number | C221 | Place of Origin | China |
High Light | C221 Diesel Engine Cylinder Liner ,8-97176-868-0 Diesel Engine Cylinder Liner ,9-11261-253-1 Diesel Engine Cylinder Liner |
C221 Diesel Engine Cylinder Liner 8-97176-868-0 9-11261-253-0 9-11261-253-1 For ISUZU
Specification
(1) Poor cylinder lubrication:
The cylinder is not lubricated enough or the oil supply is interrupted, and the cylinder is pulled due to direct metal contact. The reasons for poor cylinder lubrication include: too little oil in the oil pan or poor oil quality, too high temperature of the diesel engine, or damage or failure of the piston ring (mainly the oil ring).
(2) Insufficient running-in:
To achieve effective break-in in the shortest possible time, it is necessary to consider the issues of break-in time and load distribution. Even if the break-in is carried out for a long time under low loads, it cannot be completed. However, if the engine is in a hurry to operate at high loads, it may cause cylinder pulling. Therefore, during the diesel engine break-in period, it should be noted that the amount of oil injected should be appropriately increased; After the piston ring is renewed, it should run under low load for a period of time; After replacing the piston and cylinder liner, they should be run in before increasing the load for operation.
Applicable models | C221 |
Type | Cylinder liner |
Original number | 8-97176-868-0 9-11261-253-0 9-11261-253-1 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Product Description
,
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!