Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
Payment Terms | T/T, Western Union, MoneyGram,HSBC |
Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days |
Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support |
OEM Service | Available |
Packing | Plastic bag , Box , Carton |
Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel |
Marketing Type: | Hot Product |
Brand Name | HDPARTS |
Model Number | C15 |
Place of Origin | China |
View Detail Information
Explore similar products
2674A812 main engine turbocharger 2674A807 For PERKINS
EC210B ENGINE TURBO CHARGER VOE 21647837
KTA19 ENGINE TURBO CHARGER 3594030 For CUMMINS
A498BZG TB28 ENGINE TURBO CHARGER 020500030000 711229-5003 For XINCHAI
Product Specification
Payment Terms | T/T, Western Union, MoneyGram,HSBC | Supply Ability | 1000 Piece/Pieces per Month |
Delivery Time | 2-5 work days | Packaging Details | Plastic bag , Box , Carton |
After Warran | Online support | OEM Service | Available |
Packing | Plastic bag , Box , Carton | Application | Construction / Industry / Agriculture / Genset / Marine / Handling |
Engine Type: | Diesel | Marketing Type: | Hot Product |
Brand Name | HDPARTS | Model Number | C15 |
Place of Origin | China | ||
High Light | C15 Small Turbocharger ,CH1946 Small Turbocharger ,84-2711 |
C15 Engine small turbocharger 284-2711 CH1946 For CATERPILLAR
Specification
Applicable models | C15 |
Type | Engine turbocharger |
Original number | 284-2711 CH1946 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Maintenance error | Myth 3: boom the accelerator as soon as you start One of the characteristics of turbocharged vehicles is that they can increase the speed in a short time. However, this does not mean that the owner can treat the car rudely. In fact, it is easy to damage the oil seal of the supercharger by slamming the accelerator after starting. The number of revolutions of the turbocharged engine is very high. After starting the vehicle, the accelerator pedal should not be pressed. Instead, the engine should run at idle speed for 3-5 minutes, so that the oil pump has enough time to deliver the oil to all parts of the turbocharger. At the same time, the oil temperature rises slowly, and the fluidity is better. At this time, the acceleration will be "like a fish in water". |
matters needing attention | Keep clean When disassembling the supercharger, keep it clean. All pipe joints must be blocked with clean cloth to prevent sundries from falling into the supercharger and damaging the rotor. During maintenance, attention shall be paid not to damage the impeller. If the impeller needs to be replaced, dynamic balance test shall be conducted. After reassembly, remove the blockage. |
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1998
Total Annual:
99999-1999999
Employee Number:
80~120
Ecer Certification:
Verified Supplier
Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...
Get in touch with us
Leave a Message, we will call you back quickly!