China factories

Chat Now Send Email
China factory - Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China D7E S200G mini turbocharger 12709880018 CH1946
China D7E S200G mini turbocharger 12709880018 CH1946

  1. China D7E S200G mini turbocharger 12709880018 CH1946
  2. China D7E S200G mini turbocharger 12709880018 CH1946
  3. China D7E S200G mini turbocharger 12709880018 CH1946
  4. China D7E S200G mini turbocharger 12709880018 CH1946
  5. China D7E S200G mini turbocharger 12709880018 CH1946

D7E S200G mini turbocharger 12709880018 CH1946

  1. MOQ: 1 pc
  2. Price: Looking forward to your inquiry
  3. Get Latest Price
Payment Terms T/T, Western Union, MoneyGram,HSBC
Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days
Packaging Details Plastic bag , Box , Carton
After Warran Online support
OEM Service Available
Packing Plastic bag , Box , Carton
Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel
Marketing Type: Hot Product
Brand Name HDPARTS
Model Number D7E S200G
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union, MoneyGram,HSBC Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days Packaging Details Plastic bag , Box , Carton
After Warran Online support OEM Service Available
Packing Plastic bag , Box , Carton Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel Marketing Type: Hot Product
Brand Name HDPARTS Model Number D7E S200G
Place of Origin China
High Light D7E S200G Mini TurbochargerCH1946 Mini Turbocharger12709880018

D7E S200G mini turbocharger 12709880018 CH1946

Specification

Applicable models D7E S200G
Type Engine turbocharger
Original number 12709880018
Warranty 6 months
Engine Type Diesel
Brand Name HDPARTS
Condition New
Size OEM Size

 

matters needing attention

Don't leave without a car

After the engine is started, especially in winter, it should be idled for a period of time so that the lubricating oil can fully lubricate the bearing before the supercharger rotor runs at high speed. Therefore, do not slam the accelerator immediately after startup to avoid damaging the oil seal of the supercharger.

Maintenance error

Myth 2: turn off the engine when you arrive at your destination

After the engine runs at high load for a long time, the owner must run at idle speed for several minutes before turning off the engine, so that the parts can be effectively cooled and lubricated. The behavior of turning off the engine immediately will cause the vehicle to be in a high-speed idling state. The same problem as sudden acceleration will damage the bearing of the vehicle.

 

 

 
Product Description
 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1998

  • Total Annual:

    99999-1999999

  • Employee Number:

    80~120

  • Ecer Certification:

    Verified Supplier

Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
  • Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
  • https://www.parts-hd.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement