China factories

Chat Now Send Email
China factory - Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU
China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU

  1. China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU
  2. China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU
  3. China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU
  4. China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU
  5. China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU
  6. China 6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU

6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU

  1. MOQ: 1 pc
  2. Price: Looking forward to your inquiry
  3. Get Latest Price
Payment Terms T/T, Western Union, MoneyGram,HSBC
Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days
Packaging Details Plastic bag , Box , Carton
After Warran Online support
OEM Service Available
Packing Plastic bag , Box , Carton
Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel
Marketing Type: Hot Product
Brand Name HDPARTS
Model Number 6HK1 EX300-7
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union, MoneyGram,HSBC Supply Ability 1000 Piece/Pieces per Month
Delivery Time 2-5 work days Packaging Details Plastic bag , Box , Carton
After Warran Online support OEM Service Available
Packing Plastic bag , Box , Carton Application Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type: Diesel Marketing Type: Hot Product
Brand Name HDPARTS Model Number 6HK1 EX300-7
Place of Origin China
High Light 6HK1 ENGINE TURBO CHARGEREX300-7 ENGINE TURBO CHARGER114400-4050

6HK1 EX300-7 ENGINE TURBO CHARGER 114400-4050 For ISUZU

Specification

Applicable models 6HK1 EX300-7
Type Engine turbocharger
Original number 114400-4050
Warranty 6 months
Engine Type Diesel
Brand Name HDPARTS
Condition New
Size OEM Size

 

Fault handling

Phenomenon 1: the engine oil consumption is large, but the exhaust smoke color is normal, and the power is not reduced.

Cause: this situation is generally caused by oil leakage.

Treatment method:

1. First, check whether the external oil pipes of the engine lubrication system (including the oil inlet and return pipes of the supercharger) leak oil;

2. Check whether there is oil at the exhaust gas outlet of supercharger. If there is oil, it can be judged that the sealing ring at one end of the turbine is damaged, and the sealing ring should be replaced.

Phenomenon 2: the engine oil consumption is large, and the exhaust emits blue smoke, but the power does not drop.

Cause: the oil leakage at the pressure end of the supercharger is caused by the engine oil entering the combustion chamber through the engine intake pipe and being burned. There are several possibilities:

1. The oil return pipe of the supercharger is not unblocked, and the oil is accumulated at the middle support of the rotor assembly and flows into the compressor impeller along the rotor shaft.

2. After the seal ring or oil slinger near one end of the compressor impeller is damaged, the oil enters the impeller chamber, and then enters the combustion chamber together with the pressurized air in the chamber through the inlet pipe.

Treatment method:

1. Open the air outlet of the compressor or the straight inlet pipe (rubber hose) of the engine to see whether the oil adheres to the nozzle and pipe wall. If yes, please check whether the oil return pipe of the supercharger is unblocked. If it is not unblocked, it is caused by excessive oil accumulation at the intermediate support. The oil return pipe shall be dredged and reassembled.

2. If it is unblocked, it is caused by the damage of the sealing ring or oil slinger at one end of the impeller. The supercharger shall be disassembled for repair.

   

 

 

 
Product Description
 

Company Information

 

Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.

 

RODUCT CATEGORIES

1570502302971052897

 

 

 

Packaging & Shipping

 

Packaging material:Plastic, carton, wooden box

 

We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

 

 

Forklift Engine Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1998

  • Total Annual:

    99999-1999999

  • Employee Number:

    80~120

  • Ecer Certification:

    Verified Supplier

Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ... Established in 1998, Guangzhou STAR MUSTANG Construction Machinery Parts Co., Ltd. is one of the earliest companies in the industry to enter the construction machinery parts market. Machinery, loaders, bulldozers, graders, cranes, trucks, off-highway trucks, forklifts, etc.) engine parts production ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
  • Shop 1215/1216/1217/1218/1219, No. 36 Zhuji Road, Zhuji International Machinery City, Zhuji Street, Tianhe District, Guangzhou City, Guangdong Province
  • https://www.parts-hd.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement