Choose the cable loop with proper outer diameter and let it go through the optical cable. Peel the cable , take off the outer and inner housing, as well as loose contract tube, and wash off the filling grease, leaving 1.1~1.6mfiber and 30~50mm steel core.
Fix the cable pressing card and cable, together with cable reinforce steel core. If the diameter of the cable is less than 10mm, first bind the cable fixing point with adhesive tape till the diameter has reached 12mm, then fix it.
Lead the fiber into the melting and connecting tray, fix heat contract tube and heat melt tube to one of the connecting fiber. After melting and connecting the fiber, move heat contract tube and heat melt tube and fix the stainless (or quartz)reinforce core stick ,make sure the connecting point is in the middle of the housing pipe. Heat the pipe to make the two into one. Put the protected joint into the fiber-laying tray.(one tray can lay 12 cores)
Lay the left fiber in the melting and connecting tray evenly, and fix the winding fiber with nylon ties. Use the trays from the bottom up. After all the fiber has been connected, cover the top layer and fix it.
position it and use the earth wire in accordance with the project plan.
Sealing the cable retainer nearing the inlet of splice closure and the joint of the cable rings with sealing tape. And close the unused inlets with plugs, with exposed concave parts of the plug sealed with tapes. Then put sealing trips into the sealing groove on the sides of the shell and grease the concave part of inlet of the body between the two parts of the shell. Then close the two parts of the shell and tighten it with stainless steel bolts. The bolts should be screwed tightly with balanced force.
according to the laying requirement, position and fix the hanging tool .
Product pictures:
Main components
No.
Name of components
Quantity
Usage
Remarks
1
FOSC cover
1 piece
Protecting fiber cable splices in whole
2
Fiber optic splice tray (FOST)
Max. 6 trays (bunchy)
Max. 4 trays (ribbon)
Fixing heat shrinkable protective sleeve and holding fibers
Suitable for: Bunchy:12,24(cores);
Ribbon:6 (pieces)
3
Fiber holding tray
1 pcs
Holding fibers with protective coat
4
Base
1set
Fixing internal and external structure
5
Plastic hoop
1 set
Fixing between FOSC cover and base
6
Seal fitting
1 piece
Sealing between FOSC cover and base
7
Pressure testing valve
1 set
After inject air, it is used for pressure testing and sealing testing
Configuration as per requirement
8
Earthing deriving device
1 set
Deriving metal parts of fiber cables in FOSC for earthing connection
Configuration as per requirement
OEM/ODM Service:
If you want to display your own brand LOGO on the goods such as cable, package bag, label or any where. It is no any problem. Our OEM and ODM service is always ready to do it.
Packing:
According to Stardard Export Packing. Carton box, wooden box, wooden pallet.
Shipping:
- International express such as UPS, TNT, DHL, etc - Internatioal air: CA, AA, EA, etc - By sea
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company