Payment Terms | L/C, T/T, Western Union |
Supply Ability | 5000 |
Delivery Time | 40 work days |
Packaging Details | Bare packing, iron pallet, wood pallet, |
Warranty | 1 Year |
Condition | New |
Weight | 420 kg |
Motor | electric motor |
Energy | engrgy saving |
Color | Clients' Requirement |
Pellet size | 1-8mm |
Brand Name | gamma tech |
Model Number | GM250B |
Certification | ISO |
Place of Origin | Jiangsu CHINA |
View Detail Information
Explore similar products
22KW Small Area Feed Production Equipment Easy Installation For Pigs Cattle
22 Kw Poultry Feed Production Line 1.5 Tons/H For Various Animal Feeds
GM250A 1.5t/H Poultry Feed Production Line 11kw For Various Animal Feeds
5tph Poultry Feed Production Line Chicken Duck Cattle Sheep Feed Production
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 5000 |
Delivery Time | 40 work days | Packaging Details | Bare packing, iron pallet, wood pallet, |
Warranty | 1 Year | Condition | New |
Weight | 420 kg | Motor | electric motor |
Energy | engrgy saving | Color | Clients' Requirement |
Pellet size | 1-8mm | Brand Name | gamma tech |
Model Number | GM250B | Certification | ISO |
Place of Origin | Jiangsu CHINA | ||
High Light | ISO Poultry Feed Production Line ,8mm Feeds Poultry Production Line ,22 Kw Poultry Feed Production Line |
Technical requirements for delivery inspection
1. Output: Granular material 1-2t/h
2. Mixing uniformity of the mixer: variation coefficient cv<8%
3. The temperature of the pellets after cooling: not higher than room temperature 5 degrees
4. Particle moisture content: <13% (raw material moisture content <13%)
5. Requirements for steam boilers: 0.2T/H 0.2-0.4MPa (provided by the buyer)
6. Power requirements: 380V/50Hz three-phase four-wire 73KW (equipment capacity)
7. Equipment dimensions: length 8m, width 3.5m, height 6m.
8. Installation conditions:
(if the supplier is required to install, the following preparations must be made in advance):
a. The buyer shall prepare the plant pit, install the boiler and power supply before
equipment installation.
b. During installation, the buyer shall provide one on-site mechanic and one electrician
(responsible for future equipment production and maintenance), and 3-4 assistant
workers.
c. Provide a set of electric welding machine, oxygen acetylene electrode and 3T hand chain
hoist (see the list of installation tools for details).
d. The supplier sends a technician to the buyer’s factory to be responsible for installation,
commissioning and training of operators; the buyer’s board and lodging expenses
during installation.
e. Installation and commissioning time:
It will be completed within 15 days if the buyer has the conditions.
.
Company Details
Business Type:
Manufacturer
Year Established:
2009
Total Annual:
4000000-6000000
Employee Number:
100~150
Ecer Certification:
Active Member
Jiangsu Gamma Holdings co.,ltd established in 2009 , is a rapid growing enterpirse who integrated production and marketing of pesticides, after 13 years development from R& D and markting, we have become one of leading company in our region for feed milling industry .we are dedicating to cr... Jiangsu Gamma Holdings co.,ltd established in 2009 , is a rapid growing enterpirse who integrated production and marketing of pesticides, after 13 years development from R& D and markting, we have become one of leading company in our region for feed milling industry .we are dedicating to cr...
Get in touch with us
Leave a Message, we will call you back quickly!