Payment Terms | L/C, T/T, Western Union |
Supply Ability | 10sets per month |
Delivery Time | 30 working days |
Packaging Details | Film pack |
Product Material | Steel |
Mould life | 3 to 5 million shots |
Design software | UG, PROE, CAD |
Neck size and volume | customized |
Surface treatment | Mirror Polish |
warranty | 1 year |
Brand Name | Eceng |
Certification | CE&SGS&ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Aluminum Alloy Plastic Bottle Mould / Plastic Preform Mould With High Precision
Custom Design Plastic Bottle Mould / Pet Preform Mould With P20 Steel Material
2 Cavity Plastic Pet Bottle Moulds For Fruit Juice / Carbonated Beverage Bottles
3D Design Plastic Bottle Mould For Making Lightweight Shampoo / Cosmetics Bottle
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 10sets per month |
Delivery Time | 30 working days | Packaging Details | Film pack |
Product Material | Steel | Mould life | 3 to 5 million shots |
Design software | UG, PROE, CAD | Neck size and volume | customized |
Surface treatment | Mirror Polish | warranty | 1 year |
Brand Name | Eceng | Certification | CE&SGS&ISO |
Place of Origin | China | ||
High Light | pet preform mould ,pet bottle moulds |
High Quality Plastic pet preform mold/water bottle preform molds/plastic bottle mould
Name | Description |
Mould material | 45#, P20, 718, 2738, S136 etc. |
Mould base | C45#, LKM, HASCO etc. |
Cavity | Single / Multi-cavity |
Runner | Hot / Cold |
Mould design | 3D / 2D Drawing |
Design days | 2-3 days |
Design software | UG,PROE,CAD,CAE,CAM,CAXA ect |
Plastic material | PET,PP,PE,ABS,PS,PC, etc. |
Mould life | 3,000,000 shots |
Packing detail | waterproof film & painted anti-rust oil put in Wooded case |
Polish system | Mirror polish |
Payment | T/T, 50% deposit , 50% before shipment |
Delivery time | 10-15 days |
Specification | Depends on customers requirements |
Business Step:
1. R&D | We support customer R&D. Make the files or improve the design if you needed |
2. Quotation | Quotation will according to our customer information |
3. Negotiation | The quality, price, material, delivery time. payment item ect. |
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design |
| According to customers' request to build the mould. Before make the mould , |
| When mould are finished, we will test the mould to check it and send the sample for consumers' reference. |
| If the first sample come out is not satisfied with customer needed .we modify the mould and until meet customers satisfactory |
8. Delivery | Delivery goods by sea or by air, according to customers requirement |
Mould Maintenance:
♦ Thermal oil: adopting the hydraulic oil for the maintenance to get in the inlet of cooling water, which can play a lubrication, rust-proof role.
♦ Maintenance of guiding column: guiding column should be painted a small amount of hydraulic oil, cycle once a month.
♦ It needs to be painted rust preventive if it stops production for long time.
Company Details
Business Type:
Manufacturer
Year Established:
2007
Total Annual:
5000000-7000000
Employee Number:
30~50
Ecer Certification:
Active Member
Zhangjiagang Eceng Machinery Co.,Ltd. is the professional manufacturer of PET stretch blow moulding machines,injection molding machines,filling machine,moulds in China.It was founded in 2007,starting with PET blowing machine.It’s located at No.18,Xitang Road,Xizhang Town,Zhangjiagang... Zhangjiagang Eceng Machinery Co.,Ltd. is the professional manufacturer of PET stretch blow moulding machines,injection molding machines,filling machine,moulds in China.It was founded in 2007,starting with PET blowing machine.It’s located at No.18,Xitang Road,Xizhang Town,Zhangjiagang...
Get in touch with us
Leave a Message, we will call you back quickly!