Packaging Details | Carton |
Delivery Time | 3-4 weeks |
Payment Terms | TT |
Supply Ability | 100 pieces /month |
Name | Czochralski Furnace |
Effective Puller travel distance | 550 mm |
Pulling rate | 0~6000 mm/h |
Rotating rate | 0~40 r/min |
Place of Origin | China |
Brand Name | CRYLINK |
Certification | Iso9001 |
Model Number | CRYLINK-Czochralski Furnace |
View Detail Information
Explore similar products
Product Specification
Packaging Details | Carton | Delivery Time | 3-4 weeks |
Payment Terms | TT | Supply Ability | 100 pieces /month |
Name | Czochralski Furnace | Effective Puller travel distance | 550 mm |
Pulling rate | 0~6000 mm/h | Rotating rate | 0~40 r/min |
Place of Origin | China | Brand Name | CRYLINK |
Certification | Iso9001 | Model Number | CRYLINK-Czochralski Furnace |
High Light | bridgman furnace ,czochralski furnace |
1. Technical specification
Effective Puller travel distance: 550 mm
Pulling rate: 0~6000 mm/h
Rotating rate: 0~40 r/min
Rising/Falling speed: 0~6000 mm/h (manual control)
Weight measurement range: >9 kg
IF generator power: 0~40 Kw (6~16 KHz)
Air filling pressure: 0~0.05 MPa
Vacuum pump: 12 L/s (mechanic pump)
Chamber size:¢600 IDx1000 mm
Overall size: 1000x1000x330 0 mm
Overall weight: ~1300 Kg
Control method: Automatic/ Manual
2. Accuracy specification
Min. pulling rate0.1 mm/h
Pulling system jump: 0.001 mm (max. value measured at pulling rate of 1mm/h)
Scale display resolution: 10 mg
IF generator controlling accuracy: 0.1%
Vacuum5 Pa
3. Environment requirement
1. Power supply: three-phase five-line, 50MHz 380v+/-10%, 50Kw
2. Mounting space height3.5m
3. The main body of this equipment should be installed on a solid floor base surrounded by vibration-isolated facilities. Vibration transmitted from outside to the equipment should be less than 5um.
4. Cooling water: de-ionized water at flow rate ≥80L/min, pressure≥0.3MPa, temperature 24+/-1.5℃, temperature fluctuation rate ≤1℃ /H;
5. Ambient temperature: 24+/-1.5℃, temperature fluctuation rate ≤1℃ /H, humidity<70%
III. Main Components
Description |
Specification |
Remark |
Furnace chamber size |
¢600x1000mm |
Tailor-made service can be provided |
Pulling system |
Effective travel distance 550mm |
|
Pulling motor and driver |
Type 86 |
|
Rotating motor |
Type 90 |
|
Electrical scale |
Series AL |
Measurable weight >9kg |
IF power supply |
40kw |
|
Computer |
Industry- oriented computer |
19" liquid-crystal display |
UPS |
1kw |
Online UPS |
Mechanical pump |
12 L/S |
|
Grating / encoder |
0.001 mm |
|
Control software |
CryM |
|
IV. Technical Support
1. Offer training courses on equipment operation and installation to operator and maintenance personnel
2. Offer training courses on equipment control and structure principles;
3. Offer training courses on how to use software;
4. Offer training courses on trouble-shooting
5. One-year warranty
6. Other requirements are subject to the Contract terms;
7. Offer lifetime maintenance service (cost to be paid by the buyer);
V. Supply of complete system
1. A complete set of single crystal grower (standard configuration) includes:
a.Main body: mounting rail, vacuum furnace chamber ¢600x1000mm, puller travel distance 550mm, weight measurement system , pulling and rotating motors, vacuum sealed metal bellow, encoder, a flow meter, an air pressure measurement and control unit, seed holder (OD¢8mm), centering mechanism, water flow sensor etc.
b.Control cabinet: Industry-oriented computer (19" liquid crystal display), on-line UPS power, pulling and rotating driver control, alarm system, vacuum measurement meter, encoder display, manual control box, low voltage power supplies and press keys;
c.IF generator, adapter and inductive coil;
d.Vacuum unit: 12L/S mechanical pump, vacuum valve and vacuum measurement system;
VI. Technical Document
A set of operating instruction manual should be provided by the Seller.
VII. Payment Term
40% of total amount shall be paid within 10 working days after the contract is signed by both the buyer and the seller. The balance of 60% shall be settled when pre-acceptance is completed.
VIII. Delivery, Packing & Transportation
1. Delivery time: The Contract will become effective when down payment is received by the Seller. Delivery shall be effected within 4 months after the contract becomes effective. The date on which pre-acceptance is completed at Seller's site shall be regarded as the date of delivery.
2. Packing & transportation:
The equipment shall be packed in strong non-solid wood cases suitable for hoisting and long distance transportation by road, rail, air or sea.
Company Details
Business Type:
Manufacturer
Year Established:
2014
Employee Number:
90~100
Ecer Certification:
Active Member
Crylink is a manufacturer and supplier of Single Crystal Materials and optical components used in lasers, imaging and other optical areas. Crylink is one of the high tech company of Nanjing Institute of Advance Laser Technology(NIALT), which is the only one industrialization base of Shanghai Institu... Crylink is a manufacturer and supplier of Single Crystal Materials and optical components used in lasers, imaging and other optical areas. Crylink is one of the high tech company of Nanjing Institute of Advance Laser Technology(NIALT), which is the only one industrialization base of Shanghai Institu...
Get in touch with us
Leave a Message, we will call you back quickly!