China factories

Chat Now Send Email
China factory - Qingdao Huashida Machinery Co., Ltd.

Qingdao Huashida Machinery Co., Ltd.

  • China,Qingdao ,Shandong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China ISO9001:2008 Certified Cold Applied HDPE Anti-Corrosion Tape Manufacturing
China ISO9001:2008 Certified Cold Applied HDPE Anti-Corrosion Tape Manufacturing

  1. China ISO9001:2008 Certified Cold Applied HDPE Anti-Corrosion Tape Manufacturing
  2. China ISO9001:2008 Certified Cold Applied HDPE Anti-Corrosion Tape Manufacturing

ISO9001:2008 Certified Cold Applied HDPE Anti-Corrosion Tape Manufacturing

  1. MOQ: 1
  2. Price: US$250,000.00 - 500,000.00 1 Piece (MOQ)
  3. Get Latest Price
Payment Terms T/T,L/C
Supply Ability 30 Units/Year
Delivery Time 90 days
Packaging Details Standard Package
Board Layers Multilayer
Automation Automatic
Basing Tape Thickness 0.2-1mm
Adhesive Coating Thickness 0.1-0.5mm
Screw No. Single-screw
Computerized Computerized
Basing Tape Max. Width 1000mm
Brand Name huashida
Certification ISO9001:2008
Place of Origin qingdao,China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T,L/C Supply Ability 30 Units/Year
Delivery Time 90 days Packaging Details Standard Package
Board Layers Multilayer Automation Automatic
Basing Tape Thickness 0.2-1mm Adhesive Coating Thickness 0.1-0.5mm
Screw No. Single-screw Computerized Computerized
Basing Tape Max. Width 1000mm Brand Name huashida
Certification ISO9001:2008 Place of Origin qingdao,China
High Light ISO9001:2008 Certified Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine1000mm Max Width Cold Applied HDPE Anti-Corrosion Tape Manufacturing MachineCold Applied Pipeline Anticorrosion Wrap Tape Making Machine
PE Cold Applied Tape Pipeline Anticorrosion Wrap Tape Making Machine
Product Description
 

The cold-applied anticorrosion tape making machine is specifically designed for the production of high-quality PE tapes, primarily used for the corrosion protection of underground and overhead pipelines in industries such as oil, gas, petrochemical, and wastewater treatment. These tapes play a crucial role in safeguarding pipelines from external corrosion, moisture, and environmental damage, ensuring long-term durability and operational efficiency.

The production equipment consists of three key components:

  1. PE Base Film Extrusion Line 

  2. Adhesive Coating System 

  3. Slitting Equipment

Designed for high efficiency and reliability, this machine is essential in the production of cold-applied anticorrosion tapes, offering a cost-effective and durable solution for pipeline protection. The system is fully automated, reducing labor costs while maintaining a high standard of quality and consistency. The machine is ideal for use in high-demand industries where pipeline integrity is critical, and the risk of corrosion must be minimized.



Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline 

Technological processes

The production process of cold-applied tape typically includes the following main steps:

  1. Base Film Extrusion

    • Raw Material Preparation: Polyethylene (PE) is prepared as the base film raw material.

    • Extrusion Molding: The raw material is heated and melted in an extruder, then molded through a die to form a continuous base film.

    • Cooling and Shaping: The extruded base film is cooled and shaped using cooling rollers to ensure uniform thickness and consistency.

  2. Adhesive Coating

    • Adhesive Preparation: Butyl rubber are prepared to ensure proper viscosity and stability.

    • Coating Process: The adhesive is evenly applied to one or both sides of the base film using coating equipment to form an adhesive layer.

  3. Slitting

    • Slitting Preparation: The coated base film roll is prepared, and the parameters of the slitting equipment are adjusted.

    • Slitting Operation: The wide roll is slit into cold-applied tapes of the required width using slitting equipment.

    • Winding and Packaging: The slit cold-applied tapes are wound into rolls, packaged, and prepared for shipment.

Product Parameters


Equipment List

PE basing file extrusion line


Equipment Name  Quantity
1 Vacuum automatic feeder 1
2 Hopper dryer 1
3 SJ-75X30 extruder 1
4 Hydraulic screen changer 1
5 Die head mold type 1000  1
6 Multi-roller tape-casting machine 1
7 Winding machine 1
8 PLC computer control system 1


Adhesive coating machine

No. Equipment Name Qua.
1 Frame 1 unit
2 200N·M Magnetic powder brake + Silicone stick 1300mm with corona processor 1 unit
3 100N·M Magnetic powder brake 1 unit
4 100N·M magnetic powder clutch 2 unit
5 200N·M magnetic powder clutch 1 unit
6 Screw 1 unit
7 Force-feed device 1 unit
8 Constant pressure system 1 unit
9 Adhesive delivery pipe 1 unit
10 Winding machine 1 unit
11 Unwinding machine 2 unit
12 Coating compound equipment 1 unit
13 Main engine frequency converter 1 unit
14 Extruder frequency converter 1 unit
15 Thermal switch 1 unit
16 PLC 1 unit

 
Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline

Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline
 

Our Advantages

-Adopt advanced technology
-Stable operation
-High degree of automation, saving labor costs
-Good quality, meets international standard
-Supply full completed production solution: design, installation, commissioning,training 
-Share you 389 sets of production experience from all the world
-Having 9 professional senior engineers
-Having a high-end plastic machinery equipment expert workstation in China

 

Customer cases


Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline

Company Profile
Qingdao Huashida, a global plastic extrusion equipment R&D manufacturer and solution provider, 70% of our customers from Europe, the United States, the Middle East and Southeast Asia and other overseas countries. Huashida's R&D and manufacturing insulation pipe production line is widely used in municipal heat, sewage, water supply, natural gas and communication pipe network construction, crude oil pipeline transportation and agricultural irrigation. Relying on our innovation and product strength, we have provided customized technical services for more than 1000 manufacturers , including more than 400 domestic enterprises and more than 500 foreign enterprises and established a 24-hour global service response mechanism to effectively solve customer concerns.
Our main products are:
1. HDPE jacket pipe for pre-insulated pipe Production Line 
2. Rigid pre-insulated pipe Production Line
3. Flexible pre-insulated pipe(PERT) production line
4. Steel pipe FBE/2LPE/3LPE anti-corrosion coating line
5. Steel pipe derusting line
6. PE pressure pipe/Water Gas supply pipe production line
6. PP/PE plastic board/sheet/geomembrane production line
7. NBR PVC Thermal insulation tube/plate production line  
8.Pipeline anti-corrosion materials and instruments: heat shrink joint coating sleeve, electro-fusion weldable joint sleeve, portable welding gun(extruder), PE PP welding rod.  

 
We have been working with more than 400 overseas customers and exporting our products to Kazakhstan, Uzbekistan, Iran, Turkey, Russia, Nigeria and other countries. 

Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline
Our team
Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline

Delivery
Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline

Exhibition
Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline
Certifications
Cold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for PipelineCold Applied HDPE Anti-Corrosion Tape Manufacturing Machine for Pipeline

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2003

  • Total Annual:

    3000000-5000000

  • Employee Number:

    100~200

  • Ecer Certification:

    Verified Supplier

1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a... 1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao Huashida Machinery Co., Ltd.
  • 69 Jinsheng Second Road Chengyang District, Qingdao, Shandong, China
  • https://www.pipecoatingline.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement