| Pipe Uasge | Pre-insualte |
| Delivery Time | 60-120days |
| Extrusion Process | Multi-Layer Extrusion |
| Payment Terms | T/T |
| Pipe Dia | 219-1220mm |
| Material | HDPE LDPE |
| Supply Ability | 200 set/year |
| Weight | 27Tons |
| Speed | 1m-3m/Min |
| Pipe Material | Steel/HDPE |
| Product Type | Pipe Production Line |
| Model Number | DN110-DN560mm |
| Certification | CE, Rohs,TUV |
| Brand Name | Huashida |
| Place of Origin | China |
View Detail Information
Explore similar products
Gas / Oil / Water Pipeline Pre Insulated Pipe Production Line 35m
PERT Fiber Reinforced Flexible PU Insulated Pipe Production Line Multi Layer
Polyurethane Foam Pre Insulated Pipe Production Line Diameter Of 420-960mm
440kw HDPE Jacket Extrusion Line For PU Foaming Pre Insulated Pipe
Product Specification
| Pipe Uasge | Pre-insualte | Delivery Time | 60-120days |
| Extrusion Process | Multi-Layer Extrusion | Payment Terms | T/T |
| Pipe Dia | 219-1220mm | Material | HDPE LDPE |
| Supply Ability | 200 set/year | Weight | 27Tons |
| Speed | 1m-3m/Min | Pipe Material | Steel/HDPE |
| Product Type | Pipe Production Line | Model Number | DN110-DN560mm |
| Certification | CE, Rohs,TUV | Brand Name | Huashida |
| Place of Origin | China | ||
| High Light | HDPE outer casing extrusion line ,vacuum calibration pre-insulated pipe equipment ,district heating pipe production line | ||
The equipment consists of a steel pipe chain conveyor and pipe assembling table. The conveyor continuously passes the steel pipe into the PE jacket on the assembling table.
Qingdao Huashida District Heating Pipe HDPE Outer Casing Extrusion Line is a professional HDPE outer casing extrusion system designed for DN110-560mm / DN600-1200mm / DN980-1680mm / DN1155-2000mm (outer casing diameter) pre-insulated district heating pipes.
This line features vacuum calibration for perfect roundness, patent-pending centering device to prevent eccentricity (huashida proprietary), high-speed hdpe extrusion, high-efficiency screw technology (30% output increase), proven in multiple heating pipe projects, delivering reliable HDPE casing quality for district heating networks, combined heat and power (chp) distribution, urban central heating pipelines, pre-insulated pipe manufacturing.
With vacuum calibration technology and patent-pending centering device, this system is optimized for the China, Russia, Northern Europe, Central Asia, district heating companies, pre-insulated pipe manufacturers market. Backed by over 20 years of manufacturing experience since 2003, with 58 invention patents, and proven in multiple district heating pipe projects across China and Russia, Huashida ensures stable operation, perfect roundness, and casing quality that meets GB/T 29047 and EN 253 standards.
Technical Prameters:
| PE-365/760 | PE-420/960 | PE-850/1372 | PE-960/1680 | |
| Main extruder | SJ-90/33 | SJ-90/33 | SJ-120/33 | SJ-150/33 |
| Pipe diameter (mm) | Φ365-960 | Φ420-960 | Φ850-1372 | Φ960-1680 |
| capacity (kg/h) | 550-700 | 550-700 | 700-900 | 800-1200 |
| Installed power (kw) | 360 | 380 | 440 | 580 |
| Length (m) | 35 | 36 | 40 | 48 |
The Huashida insulation pipe production line represents a pinnacle of technology within China's industry. It features a range of innovative elements and design concepts that successfully address gaps in domestic capabilities. Among its notable advancements are four groundbreaking core technologies: the solid-liquid phase separation screw, spiral diverter head, DCL human-machine dialogue technology, and real box external manipulator technology, which are either the first or among the earliest in the sector. This revolutionary product is the only domestic production line capable of manufacturing 1880mm large-diameter insulation pipes, reinforcing its leadership in the field.
The Huashida insulation pipe production line exemplifies China's industrial strength, incorporating cutting-edge core technologies that redefine industry standards. This innovative line not only highlights a variety of novel design concepts but also effectively meets the challenges posed by domestic manufacturing limitations.
![]()
HDPE Jacket Process Flow:
Composition of Equipments:
![]()
The production steps of the insulation layer for a pre-insulated pipe, specifically focusing on the polyurethane (PU) foam insulation, are outlined below in detail:
![]()
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a... 1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a...
Get in touch with us
Leave a Message, we will call you back quickly!