Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"960-1680mm Pre-Insulated Pipe Production Line Planetary Hydraulic Cutting","imgUrl":"https:\/\/img.chinax.com\/nimg\/4f\/92\/7ddf3c17d9accae03e3dfda67889-200x200-1\/960_1680mm_pre_insulated_pipe_production_line_planetary_hydraulic_cutting.jpg","attrs":{"Brand Name":"Huashida","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China","Minimum Order Quantity":"1"}}
{"title":"Gas \/ Oil \/ Water Pipeline Pre Insulated Pipe Production Line 35m","imgUrl":"https:\/\/img.chinax.com\/nimg\/7f\/3d\/849b7bb41e7ebfd0a1b002d6ffe8-200x200-1\/gas_2f_oil_2f_water_pipeline_pre_insulated_pipe_production_line_35m.jpg","attrs":{"Brand Name":"Huashida","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China","Minimum Order Quantity":"1"}}
{"title":"PERT Fiber Reinforced Flexible PU Insulated Pipe Production Line Multi Layer","imgUrl":"https:\/\/img.chinax.com\/nimg\/2f\/f1\/fd361708f6609bb9e7bdc90d2623-200x200-1\/pert_fiber_reinforced_flexible_pu_insulated_pipe_production_line_multi_layer_extrusion.jpg","attrs":{"Brand Name":"Huashida","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China","Minimum Order Quantity":"1"}}
{"title":"Polyurethane Foam Pre Insulated Pipe Production Line Diameter Of 420-960mm","imgUrl":"https:\/\/img.chinax.com\/nimg\/2a\/a4\/12ccee810cd9705be94944a17408-200x200-1\/polyurethane_foam_pre_insulated_pipe_production_line_diameter_of_420_960mm.jpg","attrs":{"Brand Name":"Huashida","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China","Minimum Order Quantity":"1"}}
{"title":"440kw HDPE Jacket Extrusion Line For PU Foaming Pre Insulated Pipe","imgUrl":"https:\/\/img.chinax.com\/nimg\/75\/d5\/0e20b7a3b97714a92ef98b6a366e-200x200-1\/440kw_hdpe_jacket_extrusion_line_for_pu_foaming_pre_insulated_pipe.jpg","attrs":{"Brand Name":"Huashida","Model Number":"PE-850\/1372","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China"}}
{"title":"Pipe Dia 960-1680mm Pre Insulated Pipe Production Line 800-1200Kg\/H","imgUrl":"https:\/\/img.chinax.com\/nimg\/7a\/25\/2e63d2a70793394b5ce46e711cdb-200x200-1\/pipe_dia_960_1680mm_pre_insulated_pipe_production_line_800_1200kg_2fh.jpg","attrs":{"Brand Name":"Huashida","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China","Minimum Order Quantity":"1"}}
{"title":"800kg\/H HDPE Jacket Pipe Extrusion Line For Pre Insulated Pipe","imgUrl":"https:\/\/img.chinax.com\/nimg\/f9\/e1\/73108526c56c5fc46ebfda25ebeb-200x200-1\/800kg_2fh_hdpe_jacket_pipe_extrusion_line_for_pre_insulated_pipe.jpg","attrs":{"Brand Name":"Huashida","Certification":"CE, Rohs\uff0cTUV","Place of Origin":"China","Minimum Order Quantity":"1"}}
The huashida insulation pipe production line boasts a core technology that stands at the forefront of China's industry. It showcases numerous innovative points and design concepts, effectively bridging gaps in domestic capabilities. Notably, four pioneering core technologies—the solid-liquid phase separation screw, spiral diverter head, DCL human-machine dialogue technology, and real box external manipulator technology—are either the first or among the earliest implemented in the sector. This groundbreaking product stands as the sole domestic production line capable of producing 1880mm large-diameter insulation pipes, further solidifying its position as a leader in the field.
HDPE Jacket Process Flow:
Vacuum Feeding of PE Granules: The raw PE granules are automatically fed into the system via vacuum suction.
Hot Air Drying: The granules are dried using hot air to remove moisture, ensuring optimal extrusion quality.
Extrusion Plasticizing: The dried granules are plasticized through the extruder, heated and mixed to form a molten plastic mass.
Mold Shaping: The molten plastic is shaped into the desired pipe profile by passing through the extrusion die.
Vacuum Sizing: The pipe is then subjected to vacuum sizing, adjusting its dimensions to precise specifications.
Water Cooling: The pipe is cooled rapidly by immersion in a water tank to solidify its shape and structure.
Pulling Out: The solidified pipe is pulled out of the cooling tank at a controlled speed.
Cutting: The pipe is cut to the desired length using a precision cutting machine.
Carrier Laying-off: The cut pipes are then neatly laid off onto a carrier for further handling or packaging
Composition of Equipments:
Hopper Dryer
Single Screw Extruder
Extrusion Mould Die
Head Bracket
Vacuum Calibration Device
Water Cooling Tank
Haul-off Unit
Planetary Cutting Machine
Pipe Bracket
Loader
PLC (Programmable Logic Controller)
The production steps of the insulation layer for a pre-insulated pipe, specifically focusing on the polyurethane (PU) foam insulation, are outlined below in detail:
Formation of the Casing Structure:
The steel pipe is first inserted into the high-density polyethylene (HDPE) outer protection pipe, creating a casing structure.
Supports are evenly arranged in the annular space between the steel pipe and the HDPE outer pipe to maintain a uniform distance and prevent the two pipes from touching directly.
The two ends of the casing are sealed with flanges to ensure that the polyurethane foaming material will be contained within the space during the injection process.
Preparation of the Steel Pipe Surface:
Prior to the injection of the insulation material, the surface of the steel pipe undergoes pre-treatment such as shot blasting or blast cleaning. This step removes any impurities, rust, or scale, providing a clean and suitable surface for optimal adhesion of the polyurethane insulation.
Additionally, corona treatment of the polyethylene pipe shell's surface may also be performed to enhance its adhesion properties.
Injection of Polyurethane Foaming Material:
The casing structure is hoisted onto a foaming platform specifically designed for this purpose.
A high-pressure foaming machine is used to inject the polyurethane foaming material into the casing. The material expands and fills the entire annular space between the steel pipe and the HDPE outer pipe.
Curing and Formation of the Insulation Layer:
Once the polyurethane material is injected, it undergoes a curing process. During this time, the material foams and solidifies, forming a dense and durable insulation layer.
The curing time and conditions are carefully controlled to ensure that the insulation layer achieves optimal thermal and mechanical properties.
Removal of Sealing Structures and Final Inspection:
After the insulation layer has fully cured, the sealing structures (flanges) at both ends of the casing are removed.
The completed pre-insulated pipe is then inspected for any defects or imperfections in the insulation layer or the overall structure.
If the pipe meets the required specifications, it is ready for further processing or shipment.
The strong ties between the steel pipe, polyurethane insulation, and jacket pipe not only provide rigidity but also ensure that the insulation layer remains in place and performs optimally over its lifetime. The surface preparation of the steel pipe and the corona treatment of the HDPE shell contribute significantly to the overall quality and performance of the pre-insulated pipe. gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Advantages: Significantly increases the reliability of the pipeline in the PUF insulation system operational availability of remote condition monitoring PUF insulation, which allows to detect and repair leaking coolant, preventing accidents typical for thermal networks of other designs. Highly cost-effective use of pipelines in the foam insulation define the following parameters: Simplifying the construction, maintenance and repair; Increased service life of 30-40 years (traditional types of pipelines - 5-10 years); Reduction of heat losses to 8% (traditional types of pipelines - 30-40%); Reducing capital costs by 15-20% (not required construction of concrete channels and chambers for valves); Reduced operating costs by 9 times; Reduction in repair costs 3 times.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a...