Delivery Time | 20-30work days |
Payment Terms | T/T |
Supply Ability | 5-10 +sets+per mouth |
Packaging Details | Container loading,sea transportation |
Dust Removal Fan | Fan Power 5.5kw |
Coating Layers | 3 Layers |
Control System | PLC |
Recycle Of Epoxy | Air Rate 50k M³ |
Pipe Surface Preparation | Shot Blasting |
Origin | China |
Connection Type | Welding |
Operating Mode | Automatic |
Brand Name | Huashida |
Model Number | 001 |
Place of Origin | China |
Certification | CE, Rohs,TUV |
View Detail Information
Explore similar products
3lPE FBE Insulation Anti-corrosion Coating Line of Steel Pipe
159mm-1600mm 3PE Anti Corrosion Steel Pipe Production Line
426-820mm 3LPE Internal & External Blasting Coating Equipment
900kW Automated 3PE Steel Epoxy Powder Anti Corrosion Pipe Coating Production
Product Specification
Delivery Time | 20-30work days | Payment Terms | T/T |
Supply Ability | 5-10 +sets+per mouth | Packaging Details | Container loading,sea transportation |
Dust Removal Fan | Fan Power 5.5kw | Coating Layers | 3 Layers |
Control System | PLC | Recycle Of Epoxy | Air Rate 50k M³ |
Pipe Surface Preparation | Shot Blasting | Origin | China |
Connection Type | Welding | Operating Mode | Automatic |
Brand Name | Huashida | Model Number | 001 |
Place of Origin | China | Certification | CE, Rohs,TUV |
High Light | 3LPE Coated Steel Pipe Machine ,3LPE Steel Pipe Anticorrosion Coating Production Line ,3 Layer PE Steel Pipe Processing Line |
No. | Name | Set |
A. Derusting Equipment | ||
1 | Pipe-conveying Equipment | 1 |
2 | Shot Blast Cleaning Machine | 1 |
3 | Cyclone Dust Collector | 1 |
4 | Pulse dust collector | 1 |
5 | Centrifugal exhaust fan | 1 |
6 | Rust removal equipment PLC | 1 |
B. Coating equipment | ||
1 | Coating transfer equipment | 1 |
2 | IF heating device | 1 |
3 | Powder spraying device | 1 |
4 | Automatic loading dryer | 2 |
5 | SJ-65/30 Extruder | 1 |
6 | SJ-180/30 Extruder | 1 |
7 | Hot melt adhesive extruder die | 1 |
8 | PE sheet extruder head mold | 1 |
9 | Hot melt adhesive/PE sheet coating device | 1 |
10 | Environmental Protection Ventilation equipment | 1 |
11 | Cooling Spray equipment | 1 |
C.Platform Equipment | ||
1 | Steel pipe platform | 1 |
2 | Post-rust removal transition platform | 1 |
3 | Product tube storage platform | 1 |
4 | Hydraulic Equipment | 3 |
D.Groove Equipment | ||
1 | PE Beveling Machine | 2 |
2 | Hydraulic Lifting and Turning Machinery | 1 |
3 | Hydraulic Equipment | 1 |
4 | PLC | 1 |
E.Compressed air Equipment | ||
1 | Screw Air Compressor | 1 |
2 | Cold dry machine | 1 |
3 | Precision filters | 3 |
4 | Gas tanks | 1 |
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a... 1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a...
Get in touch with us
Leave a Message, we will call you back quickly!