Payment Terms | T/T |
Supply Ability | 15 SET/YEAR |
Delivery Time | 90-120 days |
Pipe Length | 12m |
Plc | Siemens |
Pipe Uasge | Oil gas pipeline |
Use Material | Epoxy powder, PE, adhesive |
Brand Name | HUASHIDA |
Model Number | 530-1420MM |
Place of Origin | Qingdao, China |
View Detail Information
Explore similar products
Gas / Oil / Water Pipeline Pre Insulated Pipe Production Line 35m
PERT Fiber Reinforced Flexible PU Insulated Pipe Production Line Multi Layer
Polyurethane Foam Pre Insulated Pipe Production Line Diameter Of 420-960mm
440kw HDPE Jacket Extrusion Line For PU Foaming Pre Insulated Pipe
Product Specification
Payment Terms | T/T | Supply Ability | 15 SET/YEAR |
Delivery Time | 90-120 days | Pipe Length | 12m |
Plc | Siemens | Pipe Uasge | Oil gas pipeline |
Use Material | Epoxy powder, PE, adhesive | Brand Name | HUASHIDA |
Model Number | 530-1420MM | Place of Origin | Qingdao, China |
Steel Pipe External Internal 2lpe 3lpe Fbe Liquid Powder Epoxy Coating Line
Coating Line Description
Steel Pipe External Internal 2lpe 3lpe Fbe Liquid Powder Epoxy Coating Line is used for anti-corrosion coating steel pipe, which is widely used in varieties of engineering construction, especially in gas and oil industries, and in water transportation.
The coating line can be applied to FBE coating(epoxy powder), Two-layer extruded polyethylene coating (2LPE), Two-layer polypropylene coating (2LPP) and Three-layer extruded polyethylene coating (3LPE).
The pipe coating line meets the requirements of producing the steel pipe with coating which meets international standards DIN30670-1991,CAN/ Z245.21-2010,ISO21809-1-2009 SY/T 0413-2002, GB/T23257-2009,GOST 9.602-2016, GOST R 51164-98.
The coating line mainly consists of the following units:
-steel pipe conveyor system
-shot/sand blasting system
-dust collector system
-pipe induction heating system
-epoxy powder spraying system
-PE&Adhesive coating system
-water cooling system
-pipe end cutting system
-hydraulic and pneumatic system
-testing system
-electronic control system
Technological process of 3LPE coating:
Pipe uploading→Shot blasting→Medium frequency induction heating→Epoxy powder spraying→Adhesive and polyethylene coating→Water cooling→Pipe end cutting back→Bevelling→Pipe unloading
The line can be customized to fit individual layout and application.
Main Equipment List and specification
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
1. Our Factory Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe... 1. Our Factory Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe...
Get in touch with us
Leave a Message, we will call you back quickly!