| Payment Terms | L/C,T/T,Western Union |
| Supply Ability | 500 Set per month |
| Delivery Time | 14 days |
| Packaging Details | Plywood box safety packing |
| Application: | General |
| Certificate: | ISO9001, ISO14001 |
| Medium Type: | Water, steam and oil etc. |
| Connection: | Threaded / Flanged / Welded |
| Standard Or Non-Standard: | Standard |
| Flow way: | Two way |
| Actuation: | Manual, Electric, Pneumatic,Automatic |
| Sealing Performance: | Sealing |
| Working Temperature: | Normal Temperature And High Temperature |
| Pressure Application: | Normal Pressure |
| Quality Warranty: | 18 Months |
| Brand Name | JGPV |
| Place of Origin | China |
View Detail Information
Explore similar products
WCB Electric Modulating Control Valve Single Seat / Double Seat Electric
Electronic Control Valve Three Way Combined Flow Regulating Control Valve
WCB CF8 Electric Control Valve Straight Through Dual Seat Pressure Regulating
Electric Actuated Single Seated Control Valve
Product Specification
| Payment Terms | L/C,T/T,Western Union | Supply Ability | 500 Set per month |
| Delivery Time | 14 days | Packaging Details | Plywood box safety packing |
| Application: | General | Certificate: | ISO9001, ISO14001 |
| Medium Type: | Water, steam and oil etc. | Connection: | Threaded / Flanged / Welded |
| Standard Or Non-Standard: | Standard | Flow way: | Two way |
| Actuation: | Manual, Electric, Pneumatic,Automatic | Sealing Performance: | Sealing |
| Working Temperature: | Normal Temperature And High Temperature | Pressure Application: | Normal Pressure |
| Quality Warranty: | 18 Months | Brand Name | JGPV |
| Place of Origin | China | ||
| High Light | Digital Locking Static Balance Valve ,Threaded Brass Cut-off Valve ,Low-Temperature Flow Control Valve | ||
Highlight: Digital locking hydraulic flow control cut-off valve, low-temperature threaded thickened brass static valve
Product introduction:
The new digital lock balance valve produced by our company is a new type of energy-saving valve with special functions. As the valve is provided with digital display and digital locking device, can be directly adjusted to any position, and pressure measurement valve for flow measurement. This valve is mainly used in industrial and civil building heating pipe network system, has the good flow characteristic, can adjust the pressure drop and flow rate accurately, can reasonable distribution of flow, implementation flow quantitatively, can effectively solve the heating (air conditioning) to room temperature uneven and the problems existing in the system, as long as in the selection and user entry fitted with appropriate specifications of digital locked balance valve, And a special intelligent instrument for one-time debugging after locking, the total water control system in a reasonable range, so as to overcome the "large flow, small temperature difference" unreasonable phenomenon. Therefore, this product is an ideal product in heating system. The application of this valve can achieve the dual effect of liquid balance and energy reduction in pipe network.
Product technical parameters:
| Model | SP45F-16Q |
| Experimental pressure | 2.4mpa (24kgf/cm2) |
| Work pressure | ≤1.6mpa (16kgf/cm2) |
| Operating temperature | -10℃≈100℃ |
| Use of medium | Water |
| Characteristic curve | Equal percentage |
| Scope of installation and use | The main trunk, branch trunk, indoor water supply main, branch riser, and multiple boilers of the pipeline network system |
Product features:
1. Before and after the static balance valve, sufficient length of branch pipe sections must be installed to ensure the rated output of the flow rate.
2. The installation position of the static balance valve should be checked according to the drawing, and it is recommended to install it on the HVAC system return pipeline. At the same time, the direction of water flow in the pipeline should be checked, and the installation should strictly follow the direction of the water flow arrow on the valve body.
3. Before installing the static balance valve, the pipeline debris must be cleaned thoroughly. It is strictly prohibited to leave welding slag, branches, stones, and other debris in the pipeline to avoid damaging the valve.
4. During the welding of pipeline flanges, excessive deformation and welding angles should not affect the flatness of the sealing surface.
5. After installation, the static balance valve should be fully opened to allow for repeated flushing of the pipeline until it is clean. It is strictly prohibited to repeatedly close the valve during pipeline flushing to avoid damage.
Our Advantages:
![]()
![]()
![]()
![]()
![]()
![]()
Company Details
Year Established:
1992
Total Annual:
10,000,000-20,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Shanghai Jianggong Valve Manufacturing Co., Ltd. is a professional manufacturer and supplier for industrial valve products, we are specialized in production and sales of all kinds of valve products, which is widely used in petroleum, chemical, metallurgy, paper, medicine, food, coal, municipa... Shanghai Jianggong Valve Manufacturing Co., Ltd. is a professional manufacturer and supplier for industrial valve products, we are specialized in production and sales of all kinds of valve products, which is widely used in petroleum, chemical, metallurgy, paper, medicine, food, coal, municipa...
Get in touch with us
Leave a Message, we will call you back quickly!