Payment Terms | T/T |
Supply Ability | 4000 pieces per week |
Delivery Time | 3-5 work days |
Packaging Details | Wooden case, pallet or according to customer's request |
Matreial | aluminum |
Shape | rectangle |
Connection mode | bolt |
Nickname (s) | Aluminum target plate soot blowing |
delivery port | Tianjin Port |
Special function | finish |
Purpose | Pipeline purging |
Standard | according to the drawing processing |
Brand Name | Ze Xu |
Model Number | Customized by pipeline |
Certification | API 、CE |
Place of Origin | Yanshan, Hebei, China |
View Detail Information
Explore similar products
Pipeline Steam Purge 10mm Steam Blowing Target Plate
Power Plant Purging Aluminum Steam Blowing Target Plate Board
ISO Alloy Main Target Plate Steam Blowing 10mm
A335 P11 High Temperature Alloy Steam Blowing Target Plate
Product Specification
Payment Terms | T/T | Supply Ability | 4000 pieces per week |
Delivery Time | 3-5 work days | Packaging Details | Wooden case, pallet or according to customer's request |
Matreial | aluminum | Shape | rectangle |
Connection mode | bolt | Nickname (s) | Aluminum target plate soot blowing |
delivery port | Tianjin Port | Special function | finish |
Purpose | Pipeline purging | Standard | according to the drawing processing |
Brand Name | Ze Xu | Model Number | Customized by pipeline |
Certification | API 、CE | Place of Origin | Yanshan, Hebei, China |
High Light | target plate for steam blowing ,API target plate for steam blowing ,bolt target plate for steam blowing |
Aluminum Target Plate For Boiler Steam Purging
pipe →temporary pipe → target plat →temporary pipe → atmosphere.
Other disposal and requirement for temporary pipe of steam blowing
1) All temporary pipelines before target plate should be based by argon arc weld, be treated by sandblast before installation and be carried out inner cleaning, finally accepted.
|
2) The temporary valves should be controlled at central control room.
|
3) The temporary pipe must be hanged and supported reliably and permit thermal expansion. |
4) The temporary pipe must be insulated.
|
|
6) Disconnect the drainage pipes from main steam, RH steam, and HP/LP bypass to flash tank, and install temporary pipes to drain.
|
7) Mechanically purge the pipes which are not blown.
|
Avoid second pollution during the system restoring.
Steam blowing
6.1 Necessary precondition check
Before boiler steam blowing, necessary precondition should be check according appendix I, the boiler steam blowing will be carried out when all of preconditions are satisfied,
6.2 Boiler steam blowing parameter
Trial steam blowing :
open temporary valves when drum pressure atrespectively | close temporary valves when drum pressure at respectively |
2.0~2.2 MPa | 1.4 MPa |
3.0~3.3 MPa | 2.0 MPa |
4.0~4.4 MPa | 3.0 MPa |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2016
Total Annual:
10000000-50000000
Employee Number:
>100
Ecer Certification:
Active Member
Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys... Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...
Get in touch with us
Leave a Message, we will call you back quickly!