| Payment Terms | L/C, D/A, D/P, T/T, Western Union, |
| Supply Ability | 10 sets per month |
| Delivery Time | 25 work days |
| Packaging Details | Standard wooden frame and wooden case |
| Product name | High Speed Mixer |
| Application | Plastic (PE, PET, TPU, PA...) |
| Capacity | 500KG/H |
| Actual Power | 4KW |
| Heating source | Electricity |
| Material | 304 Stainless Steel |
| Brand Name | Jin Machine |
| Model Number | SRL |
| Certification | CE |
| Place of Origin | Jiangsu China |
View Detail Information
Explore similar products
380 Voltage Plastic Hopper Dryer 50 Hz Wear Resistance For Bottle
Portable Honeycomb Dehumidifying Hopper Dryer -40 ℃ Dew Point SGS Approved
Oil Removal Device Plastic Hopper Dryer / Stainless Steel PET Flakes Dryer
PA Pipes Plastic Hopper Dryer Diagnostic Functions Audible Alarms Available
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, | Supply Ability | 10 sets per month |
| Delivery Time | 25 work days | Packaging Details | Standard wooden frame and wooden case |
| Product name | High Speed Mixer | Application | Plastic (PE, PET, TPU, PA...) |
| Capacity | 500KG/H | Actual Power | 4KW |
| Heating source | Electricity | Material | 304 Stainless Steel |
| Brand Name | Jin Machine | Model Number | SRL |
| Certification | CE | Place of Origin | Jiangsu China |
| High Light | stainless steel dry hopper ,hot air hopper dryer | ||
High Speed Mixer
Product Description
| Model | Volume(L) | Capacity(L) | Main Shaft Speed(r/min) | Motor Power(KW) | Heatig Power(KW) | Mixing Time(min) | Heating/Cooling Method |
| SRL-Z100/200 | 75/160 | 100/200 | 650/130/180 | 2.2 | —— |
6-10 |
Electricity/Since the friction /water |
| SRL-Z200/500 | 150/320 | 200/500 | 475/950/130 | 3 | —— | ||
| SRL-Z300/600 | 225/380 | 300/600 | 475/950/130 | 30/42 | 6 | ||
| SRL-Z500/1000 | 375/650 | 500/1000 | 430/860/60 | 47/67 | 8.4 | ||
| SRL-Z800/1600 | 600/1025 | 800/1600 | 500/50 | 60/90 | 8.4 | 8-12 | Electricity/water |
FAQ
Q1: What is your delivery time?
A1: Normally no more than 40 working days.
Q2: How to install my machines when it arrives? How much the cost?
A2: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q3: How long time for installation?
A3: Subject to machines and the situation in your factory. If everything is ready, it will take about 2 days for dryers and 15 days for central conveying system.
Q4: How about the spare parts?
A4: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
![]()
Company Details
Business Type:
Manufacturer
Year Established:
2006
Total Annual:
2000000-3000000
Ecer Certification:
Active Member
Jin Machine Ltd is established in 2006 manufacturing quality ancillary equipment for the plastics processing industy.we offer a full range of feeding, conveying, mixing and drying system. For more than 12 years constant research and development, Jin Mac... Jin Machine Ltd is established in 2006 manufacturing quality ancillary equipment for the plastics processing industy.we offer a full range of feeding, conveying, mixing and drying system. For more than 12 years constant research and development, Jin Mac...
Get in touch with us
Leave a Message, we will call you back quickly!