Packaging Details | FR or Bulk Ship |
Delivery Time | 45 working days |
Payment Terms | T/T, L/C |
Supply Ability | 120 units per year |
Model | Arch Installation Robot KGJ312 |
Dual Power | Diesel & Electric |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg |
Max.Operating Width | 20m |
Transportation Dimension (L X W X H) | 14000×3000×3450mm |
Max.Operating Height | 12m |
Booms No. | 3 |
Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Brand Name | POTENTIAL / POTENCY |
Model Number | KGJ312 |
Place of Origin | CHINA |
Certification | ISO9001:2015 |
View Detail Information
Explore similar products
Dual Power Diesel Electric Arch Installation Trolley for KGJ312 Robot
High Load Capacity Arch Installation Cart KGJ312 - 1500Kg Load, 12m Height
Dual Power Arch Installation Trolley KGJ312 with 3 Booms for Tunnel Construction
3000Kg Load-Bearing Arch Assembly Robot for Tunnel Construction KGJ312
Product Specification
Packaging Details | FR or Bulk Ship | Delivery Time | 45 working days |
Payment Terms | T/T, L/C | Supply Ability | 120 units per year |
Model | Arch Installation Robot KGJ312 | Dual Power | Diesel & Electric |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg | Max.Operating Width | 20m |
Transportation Dimension (L X W X H) | 14000×3000×3450mm | Max.Operating Height | 12m |
Booms No. | 3 | Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Brand Name | POTENTIAL / POTENCY | Model Number | KGJ312 |
Place of Origin | CHINA | Certification | ISO9001:2015 |
High Light | KGJ312 Arch Installation Trolley ,3000Kg Arch Installation Trolley ,12m Arch Installation Trolley |
High Load-bearing Capacity Arch Installation Trolley 12m Max.Operating Height 14000×3000×3450mm 3000Kg Max. Load-bearing
Based on the design specifications, the China Kyrgyzstan Uzbekistan Railway tunnel requires a minimum excavation clearance section of 5 meters in width and 6 meters in height. Currently, the available arch installation trolleys in the market are primarily utilized for arch operations in large and medium-sized tunnel sections, with a minimum operating range of more than 6 meters in width and 6 meters in height.
In light of this, we propose the development of two sets of arch trolley construction plans tailored for single-track tunnels like those found in the China Kyrgyzstan Uzbekistan Railway project. These specially designed trolleys will ensure efficient and safe operation within the specified dimensions of the tunnel clearance section.
Dual Power | Diesel & Electric |
Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Booms No. | 3 |
Max.Operating Width | 20m |
Transportation Dimension (L X W X H) | 14000×3000×3450mm |
Max.Operating Height | 12m |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg |
Model | Arch Installation Robot KGJ312 |
The KGJ312 articulated arch installation trolley can meet the minimum section of 5 meters (width) * 5 meters (height) for vertical arch operation, and can be used for tunnel arch construction of various sections such as inclined shafts, flat guides, cross passages, and main tunnels of the China Kyrgyzstan Uzbekistan railway tunnel . However, it is necessary to transport three sections of multiple arch frames to the palm face in advance.
After improvement, KGM12300 can meet the minimum section of 5 meters (width) * 6 meters (height) for vertical arch operation. Multiple arches of Unit A can be carried by oneself, but the height of the secondary lining trolley is required to be no less than 4.2 meters.
The above two options can be selected according to the actual on-site situation of the China Kyrgyzstan Uzbekistan railway tunnel .
Friendly reminder: According to the analysis of the cross-sectional data of the China Kyrgyzstan Uzbekistan railway tunnel , other construction equipment should also have the characteristics of small volume, flexible turning, and flexible deployment of the boom in the tunnel, such as wet spraying machines and drilling and anchoring integrated machines .
Product Customization Services for the Arch Installation Trolley:
Brand Name: POTENTIAL / POTENCY
Model Number: KGJ312
Place of Origin: CHINA
Certification: ISO9001:2015
Minimum Order Quantity: 1 Unit
Price: Negotiable
Packaging Details: FR or Bulk Ship
Delivery Time: 45 working days
Payment Terms: T/T, L/C
Supply Ability: 120 units per year
Max.Operating Height: 12m
Booms No.: 3
Max.Operating Width: 20m
Dual Power: Diesel & Electric
Maximum Load-bearing Capacity of The Auxiliary Arm: 1500Kg
Our Product Technical Support team for the Arch Installation Trolley is dedicated to helping you with any questions or issues you may have regarding the product. Whether you need assistance with assembly, maintenance, or troubleshooting, our team is here to provide you with expert guidance and support.
In addition to our Technical Support services, we also offer a range of services to help ensure that your Arch Installation Trolley remains in top condition. These services may include regular maintenance checks, repair services, and product upgrades. Our goal is to provide you with a comprehensive support package to maximize the performance and lifespan of your trolley.
Product Packaging:
The Arch Installation Trolley comes securely packaged in a sturdy cardboard box to ensure safe delivery. Each component is carefully wrapped and cushioned to prevent any damage during transit.
Shipping Information:
We offer fast and reliable shipping for the Arch Installation Trolley. Orders are processed within 1-2 business days, and delivery typically takes 3-5 business days, depending on your location. We provide tracking information so you can monitor the progress of your shipment.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1992
Total Annual:
15000000-50000000
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ... Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...
Get in touch with us
Leave a Message, we will call you back quickly!