Payment Terms | T/T |
Supply Ability | 10 sets /30 days |
Delivery Time | 2 to 3 weeks |
Packaging Details | wooden crate |
Color | gray |
simultaneously measurable | 4-16 power supply products |
Altitude | 1.7m |
Customizable | Yes |
Product Usage | Automatic Testing for Adapter Products |
Function | Rapidly test the performance of various power supply products. |
Brand Name | Topfer |
Model Number | Top-Smart 2000 |
Place of Origin | China |
View Detail Information
Explore similar products
Test Equipment Automatic Mobile Power Bank / Charger Test System For Comprehensi
Test Equipment HIghly Accurate Measurements Power Automatic Test System High
Test System ATE Power Automatic PC Power Test OCP \ OVP \ SHORT Function Test
Test Equipment ATE Fast Charge Adapter Power Integrated Automatic Test System
Product Specification
Payment Terms | T/T | Supply Ability | 10 sets /30 days |
Delivery Time | 2 to 3 weeks | Packaging Details | wooden crate |
Color | gray | simultaneously measurable | 4-16 power supply products |
Altitude | 1.7m | Customizable | Yes |
Product Usage | Automatic Testing for Adapter Products | Function | Rapidly test the performance of various power supply products. |
Brand Name | Topfer | Model Number | Top-Smart 2000 |
Place of Origin | China | ||
High Light | Industrial automatic test equipment ate ,Multi Port automatic test equipment ate ,ATE test equipment automation |
Test System Industrial Power Supply Automatic Test Equipment ATE Multi Port
Advantages of the series of Industrial Power Supply Testing Systems:
The series of Industrial Power Supply Testing Systems uses the latest ATE testing system software V8.0:
Industrial Power Supply Testing System Test Items:
Test items | Comprehensive Test items |
CEC test | Short circuit test |
DC Current under C.V.Mode | Short circuit current |
Peak-Peak noise | OV protection |
Serial reaction time test | UV protection |
Transient response time | OL protection |
Transient spike | OP protection |
Tracking | In-test adjustment test |
Voltage regulation | AC cycle drop out |
Current regulation | PLD simulation |
Turn ON time | DC output current test |
Rise time | DC output voltage test |
Fall time | Waveform read test |
Hold-up time | Input impulse current test |
Inrush current test | Input power |
Power good signal | Relay control |
Power fail signal | Bar code scan |
P/S ON signal | Dynamic test |
Power up sequence | Specification under C.P.Mode |
Power off sequence | Input Peak current |
Effciency test | Additional expansion measurement test |
Overall stability test | Input RMS current |
Fan Speed test | TTL signal control |
Input power factor | LAN read/write |
Input voltage ramp | RS485 read/write |
Input freq. ramp | USB read/write |
Extend the measurement test | 232 read/write |
Automatic test | GPIB read/write |
Company Details
Business Type:
Manufacturer
Year Established:
2005
Total Annual:
250-350
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE... Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...
Get in touch with us
Leave a Message, we will call you back quickly!