Payment Terms | T/T |
Supply Ability | 10 sets /30 days |
Delivery Time | 2 to 3 weeks |
Packaging Details | wooden crate |
Color | gray |
simultaneously measurable | 4-16 power supply products |
Altitude | 1.7m |
Customizable | Yes |
Product Usage | Automatic Testing for Adapter Products |
Function | Rapidly test the performance of various power supply products. |
Brand Name | Topfer |
Model Number | Top-Smart 1100 |
Place of Origin | China |
View Detail Information
Explore similar products
Test Equipment Automatic Mobile Power Bank / Charger Test System For Comprehensi
Test Equipment HIghly Accurate Measurements Power Automatic Test System High
Test System ATE Power Automatic PC Power Test OCP \ OVP \ SHORT Function Test
Test Equipment ATE Fast Charge Adapter Power Integrated Automatic Test System
Product Specification
Payment Terms | T/T | Supply Ability | 10 sets /30 days |
Delivery Time | 2 to 3 weeks | Packaging Details | wooden crate |
Color | gray | simultaneously measurable | 4-16 power supply products |
Altitude | 1.7m | Customizable | Yes |
Product Usage | Automatic Testing for Adapter Products | Function | Rapidly test the performance of various power supply products. |
Brand Name | Topfer | Model Number | Top-Smart 1100 |
Place of Origin | China | ||
High Light | Vehicle Charger Power Supply Test System ,QC4.0 Power Supply Test System ,QC4.0 automatic testing machine |
Test equipment Vehicle Charger Testing Equipment, Power Supply Testing System, Fast Charging QC2.0/3.0/4.0 Testing
Features of the Fast Charging Charger Testing System:
Efficiency:
Accuracy:
Versatility:
Usability:
Reliability:
Safety:
These characteristics make the fast charging charger testing system widely applicable in production lines, R&D departments, and after-sales services, improving product quality and production efficiency.
Test Items of the Fast Charging Charger Testing System:
Test items | Test items |
DC output voltage | Input voltage ramp |
DC output current | Input freq. ramp |
Peak-Peak noise | Tracking |
Transient response time | Short circuit test |
Transient spike | Short circuit current |
Voltage regulation | OV protection |
Current regulation | UV protection |
Turn ON time | OL protection |
Rise time | OP protection |
Fall time | In-test adjustment |
Hold-up time | AC cycle drop out |
Inrush current test | PLD simulation |
Power good signal | GPIB read/write |
Power fail signal | 232 read/write |
P/S ON signal | USB read/write |
Power up sequence | TTL signal control |
Power off sequence | Relay control |
Effciency | Bar code scan |
Input RMS current | Dynamic test |
Input power | DC Current under C.V.Mode |
Input power factor | DC : specification under C.P.Mode |
Company Details
Business Type:
Manufacturer
Year Established:
2005
Total Annual:
250-350
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE... Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...
Get in touch with us
Leave a Message, we will call you back quickly!