China factories

Chat Now Send Email
China factory - Dongguan Chuangrui New Energy Co., Ltd

Dongguan Chuangrui New Energy Co., Ltd

  • China,Dongguan ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Test System ATE Charger Automatic Test System For PD Fast Chargers Comprehensive
China Test System ATE Charger Automatic Test System For PD Fast Chargers Comprehensive

  1. China Test System ATE Charger Automatic Test System For PD Fast Chargers Comprehensive

Test System ATE Charger Automatic Test System For PD Fast Chargers Comprehensive

  1. MOQ: one set
  2. Price: To be discussed
  3. Get Latest Price
Payment Terms T/T
Supply Ability 10 sets /30 days
Delivery Time 2 to 3 weeks
Packaging Details wooden crate
Color gray
simultaneously measurable 4-16 power supply products
Altitude 1.7m
Customizable Yes
Product Usage Automatic Testing for Adapter Products
Function Rapidly test the performance of various power supply products.
Brand Name Topfer
Model Number Top-Smart 1100
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 10 sets /30 days
Delivery Time 2 to 3 weeks Packaging Details wooden crate
Color gray simultaneously measurable 4-16 power supply products
Altitude 1.7m Customizable Yes
Product Usage Automatic Testing for Adapter Products Function Rapidly test the performance of various power supply products.
Brand Name Topfer Model Number Top-Smart 1100
Place of Origin China
High Light ATE Charger Automatic Test SystemATE Charger Comprehensive Testing EquipmentPD Fast Chargers ATE Charger

 Test system ATE Charger Automatic Test System Manufacturer for PD Fast Chargers Comprehensive Testing Equipment

 

Advantages of the TopFer 1100 Switching Power Supply Automatic Testing System:

      • Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.

      • High extensibility, easily integrating standardized interface testers.

      • Fast testing speed, 3-4 times faster than traditional ATS systems.

      • Open system platform, allowing for self-edited test steps according to requirements.

      • Standardized instrument control interface and graphical operating environment (Windows interface).

      • The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.

  1. Increasing Automation: With the development of artificial intelligence and machine learning technologies, the automation level of ATE charger automatic testing systems will be further enhanced. The system can automatically identify the type, parameters, and test items of the charger under test, complete the testing process automatically, and generate detailed test reports. This not only improves the testing efficiency but also reduces the impact of human factors on the test results.

  2. Integration and Modularization Trend: In the future, ATE charger automatic testing systems will become more integrated and modular, capable of integrating multiple testing functions into one system to achieve comprehensive testing of chargers. At the same time, the modular design of the system facilitates upgrades and maintenance, allowing enterprises to choose different modules according to their needs, reducing costs and development cycles.

  3. High Precision and High Speed Testing: With the continuous development of charger technology, the requirements for precision and speed of testing systems are also increasing. ATE charger automatic testing systems will continuously improve testing accuracy and be able to measure various parameters of chargers such as voltage, current, and power more accurately. At the same time, the testing speed of the system will also be continuously improved to meet the needs of large-scale production and rapid research and development.

 

Test Items for the Switching Power Supply Testing System :

Test items Test items
Measuring under LED.Mode Tracking
DC Current under C.V.Mode Short circuit test
Peak-Peak noise Short circuit current
Current peak-Peak noise OV protection
Voltage peak-Peak noise UV protection
Transient response time OL protection
Transient spike OP protection
Voltage regulation In-test adjustment
Current regulation AC cycle drop out
Turn ON time PLD simulation
Rise time GPIB read/write
Fall time 232 read/write
Hold-up time USB read/write
Inrush current test TTL signal control
Power good signal Relay control
Power fail signal Bar code scan
P/S ON signal Dynamic test
Power up sequence Specification under C.P.Mode
Power off sequence DC output current
Effciency DC output voltage
Input RMS current Current Ripple test
Input power Dimming Current
Input power factor Dimming frequency
Input voltage ramp Dimming period
Input freq. ramp  

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2005

  • Total Annual:

    250-350

  • Employee Number:

    30~50

  • Ecer Certification:

    Verified Supplier

       Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...        Dongguan Chuangrui New Energy Co., Ltd., which is a subsidiary of Chuangrui Equipment Intelligent Manufacturing (Xi'an) Co., Ltd. (Stock Code: 836029), is a supplier that integrates R&D, production, and sales services for power automatic test systems (ATE...

+ Read More

Get in touch with us

  • Reach Us
  • Dongguan Chuangrui New Energy Co., Ltd
  • Room 5072, Unit 1, Building 1, No. 2, Nancheng Section, Tiyu Road, Nancheng Street, Dongguan City, Guangdong Province
  • https://www.powersupplytestsystem.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement