| Payment Terms | T/T, D/A, D/P, L/C, Western Union, MoneyGram |
| Supply Ability | 1 set per month Contact Now |
| Delivery Time | 30-60 days |
| Packaging Details | Standard export package |
| Part Material | PP + Fabric |
| Part Size | Standard |
| Use For | Car B Pillar Inter Trim Panel |
| Features 1 | Eco-friendly And High Performance |
| Features 2 | Attractive And Comfortable |
| Product Type | Low Pressure Injection Mould |
| Mould LIfe | >300,000 Shots |
| Quality Control | Inspected And Reconfirmed Before Shipment |
| Brand Name | Qunhe Mould |
| Model Number | Double Shot Injection Molding |
| Certification | ISO 9001: 2015 IATF 16949: 2016 |
| Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
| Payment Terms | T/T, D/A, D/P, L/C, Western Union, MoneyGram | Supply Ability | 1 set per month Contact Now |
| Delivery Time | 30-60 days | Packaging Details | Standard export package |
| Part Material | PP + Fabric | Part Size | Standard |
| Use For | Car B Pillar Inter Trim Panel | Features 1 | Eco-friendly And High Performance |
| Features 2 | Attractive And Comfortable | Product Type | Low Pressure Injection Mould |
| Mould LIfe | >300,000 Shots | Quality Control | Inspected And Reconfirmed Before Shipment |
| Brand Name | Qunhe Mould | Model Number | Double Shot Injection Molding |
| Certification | ISO 9001: 2015 IATF 16949: 2016 | Place of Origin | China |
| High Light | ISO Plastic Injection Tool ,customization Plastic Injection Tool ,customization Injection Mold Makers | ||
ISO Approved Plastic Injection Tool For Attractive Car B Pillar Inter Trim Panel
* Key Information
| We promise | All customer-oriented, never for short-term profit, and sell long-term benefits |
| We produce | Prototype, injection molding, injection Products, product assembly, surface printing, spraying the surface integration |
| Customer provide | 2D, 3D, samples, or the size of the multi-angle pictures |
| Mould Time | 35-50 working days |
| Product time | 7-15 working days |
| Moud precision | +/-0.01mm |
| Mould life | 300k-1000k million shots |
|
Producing Process
|
Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples
|
| Mould cavity | One cavity, multi-cavity or same different products be made together |
| Mould material | P20, 2738, 2344, 718, S136, 8407, NAK80, SKD61, H13 |
| Runner system | Hot runner and cold runner |
| Base material | P20, 2738, 2344, 718, S136, 8407, NAK80, SKD61, H13... |
| Finish | Pitting the word, mirror finish, matte surface... |
| Standard | DME, HASCO, FUTABO, LKM... |
|
Main equipments
|
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface finish... |
|
Software
|
CAD, PRO-E, UG Design Time: 1-3 days (normal circumstances) |
| Product material | ABS, PP, PC, PA6, PA66, TPU, POM, PBT, PVC, HIPS, PMMA, TPE, PC/ABS, TPV, TPO, TPR, EVA, HDPE, LDPE, CPVC, PVDF, PPSU, PPS, etc |
| Quality system | ISO9001: 2015; IATF16949: 2016 |
| Delivery time | Around 55 working days |
| Warranty | 12 months for free of charge |
* Main Order Procedure
| 1 | Quotation | Need 2D/3D drawing or Samples |
| 2 | Mould Design | Mould design drawing could be sent for confirmation in one week after receiving the down payment |
| 3 | Mould Making | Start mould manufacturing only after the mould design is confirmed by customers |
| 4 | Mould Trial | 1st shot samples will be available for checking |
| 5 | Sample Confirmation | Customer to check and confirm samples |
| 6 | 2nd Payment | Customer need to pay for the 2nd payment once received the T1 shot samples |
| 7 | Mould Modification | Modify the mould if necessary |
| 8 | Mould Delivery | To deliver the mould after received the 3rd payment |
| 9 | After-Sales Service | Free of charge for 12 months warranty |
| 10 | Unpaid Balance | Customer need to pay for the balance after molds having been shipped out two months |
* Mould Advantages
1. State of the art production facilities and technology
2. Professional technical team in making different standard injection moulds
3. High quality and competitive price
4. Continuous service and technical support
5. Rich experience and skilled workers
6. Professional moulding designer
7. High quality, reliability and long product lifetime
8. Use eco-friendly material
9. A very strict quality controlling system
10. Timely packaging and delivery
* During Manufacturing We Can Offer:
1. Update production process by weekly report with pictures
2. Send video and photos to customers during mould test
3. Confirm packaging with customer before mould delivery
4. One year warranty, all maintenance are free of charge during warranty
* Sample Show
RFQ is always welcome, we sincerely hope to cooperate with you from home and abroad.
Kindly contact me if any questions. It is our pleasure to be on service of you.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
1999
Total Annual:
2.5 Million-3.0 Million
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Dongguan Qunhe Mould Co., Ltd. was established in 1999. It is a high-tech enterprise focusing on precision mould design, manufacturing and injection molding. The company is located in Dongguan and has a modern factory of 5,000 square meters, equipped with advanced processing equipment and testing in... Dongguan Qunhe Mould Co., Ltd. was established in 1999. It is a high-tech enterprise focusing on precision mould design, manufacturing and injection molding. The company is located in Dongguan and has a modern factory of 5,000 square meters, equipped with advanced processing equipment and testing in...
Get in touch with us
Leave a Message, we will call you back quickly!