Packaging Details | Anti-Rust Oil, PE film covered first, Foam box, then carton |
Delivery Time | Normally, simple parts, 7-15 days, complicated parts 15-20 workdays, according quantity and the complexity of drawing. |
Payment Terms | T/T |
Mould Life | 500,000-1,000,000 Shots |
Mould Package | Wooden Case/Crate |
Mould Base | LKM, HASCO, DME, FUTABA, MISUMI, Etc. |
Design Software | UG, PROE, CAD, CAXA, Etc. |
Cavity | Single/Multi |
Mould Steel | P20, 718, 738, NAK80, S136, H13, Etc. |
Mould Standard | HASCO, DME, MISUMI, Etc. |
Mould Treatment | Nitriding/ Quenching/ Tempering/ Polishing/ Etc. |
Brand Name | Sheng Rui |
Model Number | SR-PJ0823 |
Place of Origin | China |
Certification | ISO9001: 2015 |
View Detail Information
Explore similar products
Steel H13 Injection Mold Components , Precision Machined Parts ODM
Brass Steel Injection Mould Parts Edge Gate For Air Conditioners
PA66 Injection Mold Components With CNC EDM Wire Cut ISO9001
ODM High Precision Injection Mould Parts Components ISO9001 Certification
Product Specification
Packaging Details | Anti-Rust Oil, PE film covered first, Foam box, then carton | Delivery Time | Normally, simple parts, 7-15 days, complicated parts 15-20 workdays, according quantity and the complexity of drawing. |
Payment Terms | T/T | Mould Life | 500,000-1,000,000 Shots |
Mould Package | Wooden Case/Crate | Mould Base | LKM, HASCO, DME, FUTABA, MISUMI, Etc. |
Design Software | UG, PROE, CAD, CAXA, Etc. | Cavity | Single/Multi |
Mould Steel | P20, 718, 738, NAK80, S136, H13, Etc. | Mould Standard | HASCO, DME, MISUMI, Etc. |
Mould Treatment | Nitriding/ Quenching/ Tempering/ Polishing/ Etc. | Brand Name | Sheng Rui |
Model Number | SR-PJ0823 | Place of Origin | China |
Certification | ISO9001: 2015 | ||
High Light | Tempering Plastic Moulding Parts ,718 Mould Steel Plastic Moulding Parts ,S136 Injection Mould Parts |
Injection mould parts are precision parts that are produced by injecting molten material into a mould. These parts are typically made from P20, 718, 738, NAK80, S136, H13, and other mould steel types. The lead time for these parts is usually 15-45 days, and the mould base options include LKM, HASCO, DME, FUTABA, MISUMI, and more. The expected mould life of these parts is 500,000 to 1,000,000 shots, and they can be produced with either single or multi cavity designs. Injection mould parts are commonly used for ejector pins, as well as other precision mould parts.
Sheng Rui offers high-quality, durable and reliable injection mould parts with brand name Sheng Rui, model number SR-PJ0823 and certification ISO9001: 2015. The minimum order quantity is 1, and the price depends on the drawings. Packaging details include anti-rust oil, PE film covered first, foam box, and then carton. Delivery time is normally 7-15 days for simple parts, and 15-20 workdays for complicated parts, depending on the quantity and complexity of the drawings. Payment terms are T/T. The mould base is available in LKM, HASCO, DME, FUTABA, MISUMI, etc., and the surface finish could be polishing, texture, EDM, high gloss, etc. Furthermore, the mould could be single or multi-cavity, and the mould standard is available in HASCO, DME, MISUMI, etc. Also, the mould could be shipped by sea, air, or express. Sheng Rui's injection mould parts are widely used for CNC turning parts, plastic moulding parts, and plastic moulding parts.
Injection Mould Parts
Brand Name: Sheng Rui
Model Number: SR-PJ0823
Place of Origin: China
Certification: ISO9001: 2015
Minimum Order Quantity: 1
Price: according to the drawings
Packaging Details: Anti-Rust Oil, PE film covered first, Foam box, then carton
Delivery Time: Normally, simple parts, 7-15 days, complicated parts 15-20 workdays, according quantity and the complexity of drawing.
Payment Terms: T/T
Mould Steel: P20, 718, 738, NAK80, S136, H13, Etc.
Cavity: Single/Multi
Runner: Hot/Cold
Lead Time: 15-45 Days
Material: ABS/ PC/ PP/ PE/ PA/ POM/ PMMA/ PBT/ PVC/ TPE/ TPU/ TPEE/ TPV/ PA6/ PA66/ PA12/ PA11/ PA46/ PA4T/ PA6T/ PA9T/ PA610/ PA612/ PA1010/ PA1012/ PA6I/ PA6T/ PA11I/ PA12GF/ PA46GF/ PA6GF/ PA66GF/ PA6G/ PA11G/ PA12G/ PA4G/ PA6G30/ PA6G35/ PA6Gf30/ PA6Gf35/ PPS/ PPSU/ PEEK/ PC+ABS/ PC+PBT/ PC+PET/ PC+PA/ PC+GF/ AS/ ABS+PC/ ABS+GF/ ABS+AS/ ABS+PA/ PBT+PET/ PBT+GF/ PBT+PA/ PET+PA/ PET+GF/ PA+GF/ PA+AS/ PA+PBT/ PA+PET/ POM+GF/ POM+PA/ POM+AS/ POM+PBT/ POM+PET/ PBT+PET+GF/ PBT+PET+PA/ PA+GF+PBT/ PA+GF+PET/ PA+GF+AS/ PA+GF+PBT+PET/ PA+GF+PBT+AS/ PA+GF+PBT+PET+AS
We specialize in producing precision mould parts, cnc turning parts and ejector pins. We have rich experience in manufacturing and our parts will be of the highest quality. Our mould parts are made of high-quality materials and are designed to meet your specific requirements. We are committed to providing you with the best service and products.
Injection Mould Parts Packaging and Shipping:
The Injection Mould Parts will be packaged in a sturdy box or container to ensure safe delivery. The box will be clearly marked with the part number, quantity and any relevant information. The box will also include a packing list. The box will be sealed with strong adhesive tape and labeled with "Fragile" if necessary. The Injection Mould Parts will be shipped with a reputable courier service.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2007
Total Annual:
4 million-5 million
Employee Number:
100~120
Ecer Certification:
Active Member
Dongguan Sheng Rui Mould Co., Ltd was established in August 2007. The company is located in Humen Town, Dongguan City, the key to mold town of the Pearl River Delta. The geographical position is advantageous and the transportation is convenient . &n... Dongguan Sheng Rui Mould Co., Ltd was established in August 2007. The company is located in Humen Town, Dongguan City, the key to mold town of the Pearl River Delta. The geographical position is advantageous and the transportation is convenient . &n...
Get in touch with us
Leave a Message, we will call you back quickly!