| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 50000tons Per year |
| Delivery Time | 30-35days |
| Packaging Details | wooden box or woven bag |
| Product name | 50.8*2.64 Seamless Heat Exchanger Tubes |
| Keyword | Heat Exchanger Tubes |
| Technical standard | BS3059 |
| Material | part320 10# 20# |
| End use | boiler and heat exchanger |
| Type | cold darwn seamless |
| Section shapee | Round |
| regular size | 25.4,12.7,38.1,50.8 |
| Coating | Aluminized |
| Brand Name | Torich |
| Model Number | BS3059 |
| Certification | CE ISO |
| Place of Origin | Zhejiang,China |
View Detail Information
Explore similar products
Gr High Pressure Boiler Precision Stainless Steel Tubing
High Creep Rupture Strength Seamless Steel Tubes and Pipes for High Pressure
GB/T19447 Seamless Alloy Steel Tubes / Alloy Steel Fin Tube For Heat Exchanger
Carbon Steel Type Kl Wt 10mm Extruded Fin Tube
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 50000tons Per year |
| Delivery Time | 30-35days | Packaging Details | wooden box or woven bag |
| Product name | 50.8*2.64 Seamless Heat Exchanger Tubes | Keyword | Heat Exchanger Tubes |
| Technical standard | BS3059 | Material | part320 10# 20# |
| End use | boiler and heat exchanger | Type | cold darwn seamless |
| Section shapee | Round | regular size | 25.4,12.7,38.1,50.8 |
| Coating | Aluminized | Brand Name | Torich |
| Model Number | BS3059 | Certification | CE ISO |
| Place of Origin | Zhejiang,China | ||
| High Light | Round Heat Exchanger Tubes ,Cold Drawn Seamless Heat Exchanger Tubes ,BS3059 Heat Exchanger Pipe | ||
1.standard
BS3059
2.Grade
part320 10# 20#
3.Application
boiler and heat exchanger
4.Spcificaton
O.D:5-420mm
W.T:0.5-50mm
Length: maximum 12000mm,can be customized
5.Technique
cold-drawn cold-rolled
6.Delivery condition
| Designation | Symbol | Descriptions |
| Cold drawn/hard | +C | The steel tube is not heat treated after the final cold processing |
| Cold drawn/soft | +LC | The final heat treatment is followed by appropriate processing |
| Cold drawn and stress relieved | +SR | Finally, after cold working,the steel tube is subjcted to stress removal annealing in a controlled atmosphere |
| Annealed | +A | After the final cold work, the tubes are fully annealed in a controlled atmosphere |
| Normalized | +N | After the final cold work, the steel tube is normalized in a controlled atmosphere |
Production process
![]()
Certification
![]()
About us
![]()
Exhibition
![]()
FAQ
Q1:What your terms of delivery?
A: EXW, FOB ,CFR ,CIF DDU
Q2:How about your delivery time?
A:Generally speaking, it is 5-7 days if the goods are in stock,or it is 30-45days if the goods are not in stock,it is accroding to quantity.
Q3:Can you produce accroding to the samples?
A:Yes,we canproduce by your samples or technical drawings
Q4:What your terms of packing?
A:T/T 30% as deposit,and 70%before delivery.we'll show you the products and packages before you pay the balance.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ... Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ...
Get in touch with us
Leave a Message, we will call you back quickly!