| Payment Terms | L/C, D/A, D/P, T/T, Western Union, |
| Supply Ability | 50000tons Per year |
| Delivery Time | 30-35days |
| Packaging Details | wooden box or woven bag |
| Product name | Aluminized Seamless Steel Tubes for Heat Exchanger |
| Keyword | heat exchanger tubes |
| Technical standard | BS3059 |
| Material | part320 10# 20# |
| End use | boiler and heat exchanger |
| Type | cold darwn seamless |
| Section shapee | Round |
| regular size | 25.4,12.7,38.1,50.8 |
| Coating | Aluminized |
| Brand Name | Torich |
| Model Number | BS3059 |
| Certification | CE ISO |
| Place of Origin | Zhejiang,China |
View Detail Information
Explore similar products
ASME SA213 Grade T12 Internal Thread Seamless Low-Alloy Heat Exchanger Tube with
ASTM A213 Alloy Steel Seamless Pipe Large Diameter Thick-Wall Boiler Tube for
Cold Rolled ASTM B862 Grade 2 Titanium Heat Exchanger Tube - Seamless Corrosion
G Type Finned Tubes Embedded Fin Tube Stainless Steel Pipe with 1mm-40mm
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, | Supply Ability | 50000tons Per year |
| Delivery Time | 30-35days | Packaging Details | wooden box or woven bag |
| Product name | Aluminized Seamless Steel Tubes for Heat Exchanger | Keyword | heat exchanger tubes |
| Technical standard | BS3059 | Material | part320 10# 20# |
| End use | boiler and heat exchanger | Type | cold darwn seamless |
| Section shapee | Round | regular size | 25.4,12.7,38.1,50.8 |
| Coating | Aluminized | Brand Name | Torich |
| Model Number | BS3059 | Certification | CE ISO |
| Place of Origin | Zhejiang,China | ||
| High Light | Aluminized Seamless Steel Tubes ,Heat Exchanger Seamless Steel Tubes ,5mm Steel Heat Exchanger Tubes | ||
1.standard
BS3059
2.Grade
part320 10# 20#
3.Application
boiler and heat exchanger
4.Spcificaton
O.D:5-420mm
W.T:0.5-50mm
Length: maximum 12000mm,can be customized
5.Technique
cold-drawn cold-rolled
6.Delivery condition
| Designation | Symbol | Descriptions |
| Cold drawn/hard | +C | The steel tube is not heat treated after the final cold processing |
| Cold drawn/soft | +LC | The final heat treatment is followed by appropriate processing |
| Cold drawn and stress relieved | +SR | Finally, after cold working,the steel tube is subjcted to stress removal annealing in a controlled atmosphere |
| Annealed | +A | After the final cold work, the tubes are fully annealed in a controlled atmosphere |
| Normalized | +N | After the final cold work, the steel tube is normalized in a controlled atmosphere |
Production process
![]()
Certification
![]()
About us
![]()
Exhibition
![]()
FAQ
Q1:What your terms of delivery?
A: EXW, FOB ,CFR ,CIF DDU
Q2:How about your delivery time?
A:Generally speaking, it is 5-7 days if the goods are in stock,or it is 30-45days if the goods are not in stock,it is accroding to quantity.
Q3:Can you produce accroding to the samples?
A:Yes,we canproduce by your samples or technical drawings
Q4:What your terms of packing?
A:T/T 30% as deposit,and 70%before delivery.we'll show you the products and packages before you pay the balance.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat... Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat...
Get in touch with us
Leave a Message, we will call you back quickly!