| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 50000 tons per year |
| Delivery Time | 45-60 working days |
| Packaging Details | Packed in wooden boxes or in hexagonal packing |
| OD | 15.9-25.4mm |
| WT | ≥0.7mm |
| Surface | Polished |
| Standard | DIN, AISI, ASTM, GB |
| Technics | Cold Drawn |
| name | Seamless Alloy Steel Tube |
| Brand Name | Torich |
| Model Number | ASTMB395 ASTM B111 |
| Place of Origin | China |
| Certification | API, CE, BSI, UL |
View Detail Information
Explore similar products
Copper / Copper Alloy Condenser Seamless Steel Tube 10 - 80mm OD ASTM B111
Titanium Welded Seamless Alloy Steel Pipe TA3 TA9 TA10 0.5 - 2mm Wall Thickness
Automobile High Carbon Chromium 100cr6 Bearing Tube 16MnCr5
Astmb338 Coll Roll Titanium Alloy Tube For Heat Exchangers / Condensers
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 50000 tons per year |
| Delivery Time | 45-60 working days | Packaging Details | Packed in wooden boxes or in hexagonal packing |
| OD | 15.9-25.4mm | WT | ≥0.7mm |
| Surface | Polished | Standard | DIN, AISI, ASTM, GB |
| Technics | Cold Drawn | name | Seamless Alloy Steel Tube |
| Brand Name | Torich | Model Number | ASTMB395 ASTM B111 |
| Place of Origin | China | Certification | API, CE, BSI, UL |
| High Light | alloy steel tube ,alloy steel seamless tube | ||
ASTM B395 Seamless Copper and Copper Alloy Heat Exchanger Condenser U-bend Steel Tubes
| Product name: | U bend steel tubes |
| Standard: | ASTM B395,ASTM B111 |
| Application: | Heat exchanger, boiler,evaporator,condenser |
| Technical: | Cold drawn |
| Surface Tratement: | Oiled |
| Type: | Seamless steel tube |
| Payment: | T/T,L/C,Western Union, Money Gram |
| Terms of delivery: | FOB,CIF,CFR,CPT,etc |
| Delivery time: | 45-60 working days |
| Certificate: | ISO9001 |
Product show:
![]()
![]()
Production Workshop:
![]()
Packing&Shipping:
![]()
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
A&Q
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample of SCM 440 42CrMo Mechanical Tubing for Reinforcement sleeve for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ... Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ...
Get in touch with us
Leave a Message, we will call you back quickly!