| Payment Terms | L/C, D/A, D/P, T/T, Western Union, |
| Supply Ability | 25000 tons/year |
| Delivery Time | 25-35 Days |
| Packaging Details | in woven bags packing |
| Product name | Seamless Precision Tube E235 Cold Drawn Cylinder EN10305-1 Pipe |
| Length | 5.8m-11.8m |
| Standard | EN10305-1 |
| WT | 0.5-50mm |
| OD | 5-420mm |
| Usage | Hydraulic Cylinder, honed steel tube,Oil Cylinder |
| Surface finish | Oiled |
| Type | Carbon |
| Shape | Round |
| Keyword | Seamless precision steel tube |
| Brand Name | TORICH |
| Model Number | EN10305-1 |
| Certification | ISO,CE |
| Place of Origin | China |
View Detail Information
Explore similar products
Cold Drawn Shock Absorber Tube with High Dimensional Accuracy for Automotive
AISI 4140 Seamless Tubing Medium Carbon Alloy Steel Seamless Pipe For Mechanical
ERW Precision Steel Tubes ERW Precision Tubes
High Tolerance Seamless Steel Tubes / Precision Steel Pipe Pipe For Automotive
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, | Supply Ability | 25000 tons/year |
| Delivery Time | 25-35 Days | Packaging Details | in woven bags packing |
| Product name | Seamless Precision Tube E235 Cold Drawn Cylinder EN10305-1 Pipe | Length | 5.8m-11.8m |
| Standard | EN10305-1 | WT | 0.5-50mm |
| OD | 5-420mm | Usage | Hydraulic Cylinder, honed steel tube,Oil Cylinder |
| Surface finish | Oiled | Type | Carbon |
| Shape | Round | Keyword | Seamless precision steel tube |
| Brand Name | TORICH | Model Number | EN10305-1 |
| Certification | ISO,CE | Place of Origin | China |
| High Light | Oiled Seamless Precision Steel Tube ,EN10305-1 Seamless Precision Steel Tube ,Oil Cylinder Seamless Precision Steel Tube | ||
Seamless Precision Tube E235 Cold Drawn Cylinder EN10305-1 Pipe
TORICH has over 20 years expereince in producing seamless precision steel tube. There are many kinds of delivery condition we can offer: NBK,GBK,BK,BKS
Basic information of seamless precision steel tube:
Technique: Cold Drawn
Material: E235,E355,E215
Keyword: Honed steel tube, seamless precision tube
OD: 5-420 mm
WT: 0.5-50 mm
Length: Max 12000mm
Additional Info:
Packaging: anti rust, woven bags with two slings
Transportation: Ocean,Land,Air
Place of Origin: China (Zhejiang)
Certificate: ISO9001,ISO14001,TS16949
Port: Shanghai,Ningbo
Chemical components of E355,E235,E235 precision steel tube:
| Steel Tube | C | Si | Mn | P | S | Al |
| E215 | 0.1 | 0.05 | 0.7 | 0.025 | 0.025 | 0.025 |
| E235 | 0.17 | 0.35 | 1.2 | 0.025 | 0.025 | - |
| E355 | 0.22 | 0.55 | 1.6 | 0.025 | 0.025 | - |
Main feature:
| High precision | Excellent brightness |
| No oxidization on outer and inner walls after heat treatment | High cleanness of inside wall |
| Good straightness | No burr |
| High pressure | No deformation after clod bending |
| No crack after flaring and flattening | Color : Gray with white |
Delivery condition:
| BK (+C) Cold finished/hard (cold finished as drawn) | No heat treatment after the last cold forming process. |
| BKW (+LC) Cold finished/soft (lightly cold worked) | After the last heat treatment there is a light finishing pass (cold drawing).
|
| BKS (+SR) Cold finished/stress relieve annealed. | After the final cold forming process the tubes are stress relieve annealed. |
| GBK (+A) Annealed | After the final cold forming process the tubes are annealed in a controlled atmosphere |
| NBK (+N) Normalized. (Mainly focus on) | After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere |
Production routing:
Quality carbon steel from Bao Steel etc big mill, cold drawing the heat treatment without oxidization , NBK condition.
Do nondestructive testing ,HT tests and do dipping oil antirust protection, Packed tube in wooden boxes
Product show:
![]()
Various package:
![]()
![]()
FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
Q:What is your payment method?
A:30% deposit in advance, 70% paid before shipment.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat... Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat...
Get in touch with us
Leave a Message, we will call you back quickly!