| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 25000 tons/year |
| Delivery Time | 25-35 Days |
| Packaging Details | Packing in bundles in seaworthy package |
| Product name | Precision Seamless Steel Pipe Cold Drawn Carbon Steel Tube EN10305-1 E355 |
| Length | 5.8m-11.8m |
| Standard | DIN2391 EN10305-1 |
| WT | 0.5-50mm |
| OD | 4-420mm |
| Usage | Hydraulic industry |
| Surface finish | Oiled |
| Shape | Round |
| Brand Name | TORICH |
| Model Number | En10305-1 |
| Certification | ISO,CE |
| Place of Origin | China |
View Detail Information
Explore similar products
Cold Drawn Shock Absorber Tube with High Dimensional Accuracy for Automotive
AISI 4140 Seamless Tubing Medium Carbon Alloy Steel Seamless Pipe For Mechanical
ERW Precision Steel Tubes ERW Precision Tubes
High Tolerance Seamless Steel Tubes / Precision Steel Pipe Pipe For Automotive
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 25000 tons/year |
| Delivery Time | 25-35 Days | Packaging Details | Packing in bundles in seaworthy package |
| Product name | Precision Seamless Steel Pipe Cold Drawn Carbon Steel Tube EN10305-1 E355 | Length | 5.8m-11.8m |
| Standard | DIN2391 EN10305-1 | WT | 0.5-50mm |
| OD | 4-420mm | Usage | Hydraulic industry |
| Surface finish | Oiled | Shape | Round |
| Brand Name | TORICH | Model Number | En10305-1 |
| Certification | ISO,CE | Place of Origin | China |
| High Light | E355 Cylinder Carbon Steel Pipe ,Cold Drawn Seamless Carbon Steel Pipe ,EN10305-1 Carbon Steel Pipe | ||
Precision Seamless Steel Pipe Cold Drawn Carbon Steel Tube EN10305-1 E355
TORICH is a 20 years experience steel manufacturer of EN 10305-1 seamless precision steel tube with delivery condition like BKS,GBK,NBK,BK.
1. Brief introduction of precision seamless steel pipe:
Length:
Random length: with a minimum of 3m. The length difference between the tubes shall not exceed 2 m per order item.
Approximate length: specified length with a length tolerance of ±500mm. Up to 10% of the quantity ordered may be supplied in short length≥2m. Short length shall be bundled seperately.
Manufacturing:
The precision seamless steel pipes shall be manufactured from hot finished seamless hollows by cold drawing.
Apperance:
The precision seamless steel pipe tube shall have smooth outer and inner surfaces.
Roughness:
For high precision steel pipe of OD: D≤260mm
----≤4um on the outer surface of tubes in the delivery conditions +SR,+A and +N;
----≤4um on the outer and inner surface of tubes in the delivery conditions +C and +LC, where the requirement for the inner surface applies for specified or calculated inside diameters ≥15mm.
For tubes of OD>260mm: ≤4um on the outer and inner surface.
2.Delivery condition:
| BK (+C) Cold finished/hard (cold finished as drawn) | No heat treatment after the last cold forming process. |
| BKW (+LC) Cold finished/soft (lightly cold worked) | After the last heat treatment there is a light finishing pass (cold drawing).
|
| BKS (+SR) Cold finished/stress relieve annealed. | After the final cold forming process the tubes are stress relieve annealed. |
| GBK (+A) Annealed | After the final cold forming process the tubes are annealed in a controlled atmosphere |
| NBK (+N) Normalized. (Mainly focus on) | After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere |
3. Seamless precision steel tube show:
![]()
![]()
4.Packing methods:
![]()
![]()
QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
5.FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
#torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ... #torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ...
Get in touch with us
Leave a Message, we will call you back quickly!