Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 25000 tons/year |
Delivery Time | 25-35 Days |
Packaging Details | Packing in bundles in seaworthy package |
Product name | Precision Seamless Steel Pipe Cold Drawn Carbon Steel Tube EN10305-1 E355 |
Length | 5.8m-11.8m |
Standard | DIN2391 EN10305-1 |
WT | 0.5-50mm |
OD | 4-420mm |
Usage | Hydraulic industry |
Surface finish | Oiled |
Shape | Round |
Brand Name | TORICH |
Model Number | En10305-1 |
Certification | ISO,CE |
Place of Origin | China |
View Detail Information
Explore similar products
ERW Precision Steel Tubes ERW Precision Tubes
High Tolerance Seamless Steel Tubes / Precision Steel Pipe Pipe For Automotive
Torich GB/T13793 Q195 Welded Steel Tube ERW Precision Steel Tube
Carbon Seamless Precision Steel Tube Bright Annealing Surface For Motorcycle
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 25000 tons/year |
Delivery Time | 25-35 Days | Packaging Details | Packing in bundles in seaworthy package |
Product name | Precision Seamless Steel Pipe Cold Drawn Carbon Steel Tube EN10305-1 E355 | Length | 5.8m-11.8m |
Standard | DIN2391 EN10305-1 | WT | 0.5-50mm |
OD | 4-420mm | Usage | Hydraulic industry |
Surface finish | Oiled | Shape | Round |
Brand Name | TORICH | Model Number | En10305-1 |
Certification | ISO,CE | Place of Origin | China |
High Light | E355 Cylinder Carbon Steel Pipe ,Cold Drawn Seamless Carbon Steel Pipe ,EN10305-1 Carbon Steel Pipe |
Precision Seamless Steel Pipe Cold Drawn Carbon Steel Tube EN10305-1 E355
TORICH is a 20 years experience steel manufacturer of EN 10305-1 seamless precision steel tube with delivery condition like BKS,GBK,NBK,BK.
1. Brief introduction of precision seamless steel pipe:
Length:
Random length: with a minimum of 3m. The length difference between the tubes shall not exceed 2 m per order item.
Approximate length: specified length with a length tolerance of ±500mm. Up to 10% of the quantity ordered may be supplied in short length≥2m. Short length shall be bundled seperately.
Manufacturing:
The precision seamless steel pipes shall be manufactured from hot finished seamless hollows by cold drawing.
Apperance:
The precision seamless steel pipe tube shall have smooth outer and inner surfaces.
Roughness:
For high precision steel pipe of OD: D≤260mm
----≤4um on the outer surface of tubes in the delivery conditions +SR,+A and +N;
----≤4um on the outer and inner surface of tubes in the delivery conditions +C and +LC, where the requirement for the inner surface applies for specified or calculated inside diameters ≥15mm.
For tubes of OD>260mm: ≤4um on the outer and inner surface.
2.Delivery condition:
BK (+C) Cold finished/hard (cold finished as drawn) | No heat treatment after the last cold forming process. |
BKW (+LC) Cold finished/soft (lightly cold worked) | After the last heat treatment there is a light finishing pass (cold drawing).
|
BKS (+SR) Cold finished/stress relieve annealed. | After the final cold forming process the tubes are stress relieve annealed. |
GBK (+A) Annealed | After the final cold forming process the tubes are annealed in a controlled atmosphere |
NBK (+N) Normalized. (Mainly focus on) | After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere |
3. Seamless precision steel tube show:
4.Packing methods:
QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
5.FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ... Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ...
Get in touch with us
Leave a Message, we will call you back quickly!