| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 500 Tons Per Month |
| Delivery Time | 4-6 Weeks |
| Packaging Details | In bundles |
| Brand Name | TORICH |
| Model Number | ASTM A519 |
| Certification | ISO 9001 |
| Place of Origin | Zhejiang China |
View Detail Information
Explore similar products
Copper / Copper Alloy Condenser Seamless Steel Tube 10 - 80mm OD ASTM B111
Titanium Welded Seamless Alloy Steel Pipe TA3 TA9 TA10 0.5 - 2mm Wall Thickness
Automobile High Carbon Chromium 100cr6 Bearing Tube 16MnCr5
Astmb338 Coll Roll Titanium Alloy Tube For Heat Exchangers / Condensers
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 500 Tons Per Month |
| Delivery Time | 4-6 Weeks | Packaging Details | In bundles |
| Brand Name | TORICH | Model Number | ASTM A519 |
| Certification | ISO 9001 | Place of Origin | Zhejiang China |
| High Light | 4130 seamless steel tube ,crmo alloy seamless steel tube ,seamless crmo alloy steel tube | ||
CUSTOM BIKE FORKS 4130 CRMO MATERIAL ALLOY SMALL DIAMETER SEAMLESS STEEL TUBE
4130 Alloy Chromoly Steel Pipe
| Chemical Composition(%) | Mechanical Property | |||||||||
| C | Si | Mn | S | P | Cr | Ni | Cu | Mo | Yield Strength | Tensile Strength |
| ( σs ) | ( σb ) | |||||||||
| 0.28~0.33 | 0.15~0.30 | 0.40~0.60 | ≤0.04 | ≤0.035 | ≤0.15 | 0.80~1.10 | / | 0.15~0.25 | ≥785(80) (MPa) | ≥930(95) |
| (MPa) | ||||||||||
| End Shape | Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements | |||||||||
| Surface | Oiled, Galvanized, Phosphate etc | |||||||||
| Treatment | ||||||||||
| Technique | Cold drawn | |||||||||
| Application | 1. Automotive and mechanical pipes | |||||||||
| 2. Petroleum cracking pipes | ||||||||||
| 3. High Pressure Boiler Pipe | ||||||||||
| 4. Low and middle pressure fluid transportation pipeline | ||||||||||
| 5. Chemical fertilizer equipment pipes | ||||||||||
| 6. Heat exchanger pipes | ||||||||||
| Delivery | 1. BK (+C) | No heat treatment after last cold forming process. | ||||||||
| Conditions | 2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | ||||||||
| 3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |||||||||
| 4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |||||||||
| 5. NBK (+N) | After the final cold forming process the tubes are annealed above the upper transformation point in acontrolled atmosphere. | |||||||||
| Package | 1. Bundle Packing. | |||||||||
| 2. Plain end or vanished as per customer's request. | ||||||||||
| 3. Wrapped in waterproof paper. | ||||||||||
| 4. Sackcloth with several steel strips. | ||||||||||
| 5. Pack in heavy tri-wall boxes | ||||||||||
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ... Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ...
Get in touch with us
Leave a Message, we will call you back quickly!