| Name | ASTM B444 UNS N06625 Inconel 625 DIN2.4856 Alloy 625 steel pipe/tube |
| Type | Nickel Pipe |
| Surface | Bright polished |
| Material | Inconel 625, inconel 625 pipe |
| Condition | Soft Annealed |
| Technique: | Hot Rolled Cold Rolled |
| Payment Terms | L/C, D/A, T/T, D/P, Western Union, MoneyGram |
| Supply Ability | 2 tons |
| Delivery Time | 7-20 days |
| Packaging Details | Suitable for transportation and packing |
| Brand Name | Torich |
| Model Number | 625 |
| Certification | CE,ISO |
| Place of Origin | China |
View Detail Information
Explore similar products
Hastelloy C276 Tube Nickel Alloy Seamless Tube ASTM B622 ASME SB-622 EN 10204
ASME SA213 T11 Alloy Steel Seamless Tubes For Boilers And Heat Exchangers
Efw Chromium Nickel Alloy Steel Pipe Astm A358 For High Temperature Service
4340 Tubing Chromoly Alloy Steel Seamless Round Tube For High Temperature
Product Specification
| Name | ASTM B444 UNS N06625 Inconel 625 DIN2.4856 Alloy 625 steel pipe/tube | Type | Nickel Pipe |
| Surface | Bright polished | Material | Inconel 625, inconel 625 pipe |
| Condition | Soft Annealed | Technique: | Hot Rolled Cold Rolled |
| Payment Terms | L/C, D/A, T/T, D/P, Western Union, MoneyGram | Supply Ability | 2 tons |
| Delivery Time | 7-20 days | Packaging Details | Suitable for transportation and packing |
| Brand Name | Torich | Model Number | 625 |
| Certification | CE,ISO | Place of Origin | China |
| High Light | DIN2.4856 Alloy 625 Tube ,UNS N06625 Alloy 625 Tube ,DIN2.4856 alloy 625 pipe | ||
Torich ASTM B444 UNS N06625 Inconel 625 DIN2.4856 Alloy 625 steel pipe/tube
| Name: | Torich ASTM B444 UNS N06625 Inconel 625 DIN2.4856 Alloy 625 steel pipe/tube |
| Model: | 625 |
| Out Diameter | 6-630mm |
| Thickness | 1-35mm |
| Finish: | Polish, Satin, PVD and Golden |
| Package: | PVC bag for each single piece, 4-8 pcs in a box, about 4-6 boxes into one carton, green weave bag outside the carton. |
| Delivery time: |
15-25 working days. |
| Payment terms: | TT, 30% down payment in advance, 70% balance before shipment |
| Trade terms: | EXW, FOB, CIF,CFR,CPT |
Package:
1. cases packed in wooden cases
2. paper packaging
3. plastic packing
4. foam packaging
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
Product show:
![]()
![]()
![]()
![]()
![]()
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.
Q:How is your production capability?
A:1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment
Q:How to get the sample?
A:1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
#torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ... #torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ...
Get in touch with us
Leave a Message, we will call you back quickly!