| Payment Terms | L/C, D/A, D/P, T/T, Western Union, |
| Supply Ability | 60000 Ton per year |
| Delivery Time | 30-35 days |
| Packaging Details | packing in wooden boxes or in hexagonal bundles |
| Product name | JIS G3461 Seamless and welded carbon steel tube for boiler tube and heat-exchanger |
| Product Keyword | Seamless and welded carbon steel pipe |
| Grade | STB340 STB410 STB 510 |
| Application | For boiler pipe, smoke pipe, heat-exchanger and chemical industry |
| Secondary | Non-secondary |
| Section shape | Round |
| Brand Name | TORICH |
| Model Number | JIS G3461 |
| Certification | ISO9001; ISO14001; TSI16949 |
| Place of Origin | ZheJiang,CHINA |
View Detail Information
Explore similar products
ASME SA213 Grade T12 Internal Thread Seamless Low-Alloy Heat Exchanger Tube with
ASTM A213 Alloy Steel Seamless Pipe Large Diameter Thick-Wall Boiler Tube for
Cold Rolled ASTM B862 Grade 2 Titanium Heat Exchanger Tube - Seamless Corrosion
G Type Finned Tubes Embedded Fin Tube Stainless Steel Pipe with 1mm-40mm
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, | Supply Ability | 60000 Ton per year |
| Delivery Time | 30-35 days | Packaging Details | packing in wooden boxes or in hexagonal bundles |
| Product name | JIS G3461 Seamless and welded carbon steel tube for boiler tube and heat-exchanger | Product Keyword | Seamless and welded carbon steel pipe |
| Grade | STB340 STB410 STB 510 | Application | For boiler pipe, smoke pipe, heat-exchanger and chemical industry |
| Secondary | Non-secondary | Section shape | Round |
| Brand Name | TORICH | Model Number | JIS G3461 |
| Certification | ISO9001; ISO14001; TSI16949 | Place of Origin | ZheJiang,CHINA |
| High Light | JIS G3461 Seamless Carbon Steel Tube ,Boiler Welded Carbon Steel Tube | ||
Application: For boiler pipe, smoke pipe, heat-exchanger and chemical industry
Technique: Cold-finished, hot-finished, ERW
Chemical Composition:
| Grade | Process | Chemical Composition (%) | ||||||||
| C | Si | Mn | P | S | Ni | Cr | Mo | Others | ||
| STB340 | S, E | 0.18Max | 0.35Max | 0.30~0.60 | 0.035Max | 0.035Max | - | - | - | - |
| STB410 | S, E | 0.32Max | 0.35Max | 0.30~0.60 | 0.035Max | 0.035Max | - | - | - | - |
| STB510 | S, E | 0.25Max | 0.35Max | 1.00~1.50 | 0.035Max | 0.035Max | - | - | - | - |
Mechanical proporties:
| Symbol of class | Tensile strength N/mm2 {kgf/mm2} | Yield point or proof stress N/mm2 {kgf/mm2} | Elongation % | ||
| Outside diameter 20mm or over | Outside diameter 10mm or over to and excl. 10mm | Outside diameter under 10mm | |||
| No. 11 test piece No. 12 test piece | No. 11 test piece | No. 11 test piece | |||
| STB340 STB410 STB510 | 340{35}min. 410{42} min. 510{52} min. | 175{18} min. 255{26} min. 295{30} min. | 35 min. 25 min. 25 min. | 30 min. 20 min. 20 min. | 27 min. 17 min. 17 min. |
Manufacture Method:
| Symbol of class | Heat treatment | ||||
| Hot finished seamless steel tube | Cold finished seamless steel tube | Electric resistance welded steel tube other than hot finished or cold finished steel tube | Finished electric resistance welded steel tube | Fold finished electric resistance welded steel tube | |
| STB 340 | As manufactured, as required, low temperature annealing or normalizing may be performed. | Low temperature annealing, normalizing or full annealing. | Normalizing | As manufactured. However, as required, low temperature annealing or normalizing may be performed. | Normalizing |
| STB 410 | As manufactured. However, as required, low temperature annealing or normalizing may be performed. | Low temperature annealing, normalizing or full annealing. | Normalizing | Low temperature annealing | |
| STB 510 | Normalizing | ||||
Product show:
![]()
![]()
![]()
![]()
Q: Are you trading company or manufacturer?
A: We are a professional steel pipes materials manufacturer.
Q: How long is your delivery time?
A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.
Q: Do you provide free samples?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat... Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat...
Get in touch with us
Leave a Message, we will call you back quickly!