| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Delivery Time | 35-45days |
| Packaging Details | In wooden boxes or hexagonal bundles in seaworthy packing |
| Product Name | JIS G3441 CARBON STEEL SEAMLESS TUBES |
| Model No | JIS G3441 |
| Technique | Cold Drawn |
| Surface Treatment | Oiled |
| Type | Seamless |
| Alloy Or Not | Non-alloy |
| Section Shape | Round |
| Application | For Boilers,Superheaters,Steam Linepipes Of Boilers |
| Brand Name | TORICH |
| Model Number | JIS G3441 |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
JIS G4105 SCM440 Alloy Steel Seamless Pipes for High Temperature Applications
ASTM A501 Gr.A Gr.B Seamless Carbon Steel Tube for Construction
ASTM A501 Seamless Carbon Steel Tube for Construction
20MnG High Pressure Boiler Tube Alloy Seamless Pipe For Boilers Heat Exchangers
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Delivery Time | 35-45days |
| Packaging Details | In wooden boxes or hexagonal bundles in seaworthy packing | Product Name | JIS G3441 CARBON STEEL SEAMLESS TUBES |
| Model No | JIS G3441 | Technique | Cold Drawn |
| Surface Treatment | Oiled | Type | Seamless |
| Alloy Or Not | Non-alloy | Section Shape | Round |
| Application | For Boilers,Superheaters,Steam Linepipes Of Boilers | Brand Name | TORICH |
| Model Number | JIS G3441 | Place of Origin | CHINA |
| High Light | Jis G3441 Carbon Steel Seamless Tubes ,Steel Seamless Tubes For Machinery | ||
JIS G3441 CARBON STEEL SEAMLESS TUBES
Standard: JIS G 3441
Application of JIS G 3441 Alloy Seamless Steel Tubes
Pipe ordered under this specification for machinery, automobiles and other machine parts.
Manufacturing Process of JIS G 3441 Alloy Seamless Steel Tubes:
By a seamless process: hot finished and cold finished (with annealed)
Details of JIS G 3441 Alloy Seamless Steel Tubes We can supply:
Manufacture:seamless pipe (hot finished and cold finished)
Size: O.D.: 15.0~114mm W.T.: 2~20mm
Grade: Class1, Class2, Class3
Length: 6M or specified length as required.
Ends: Plain End, Beveled End.
Grade and Chemical Composition (%)
| Grade | C≤ | Si | Mn | P≤ | S≤ | Cr | Mo |
| SCM 420TK | 0.18~0.23 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | - |
| SCM 415TK | 0.13~0.18 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | 0.15~0.30 |
| SCM 418TK | 0.16~0.21 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | 0.15~0.30 |
| SCM 420TK | 0.18~0.23 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | 0.15~0.30 |
| SCM 430TK | 0.28~0.33 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | 0.15~0.30 |
| SCM 435TK | 0.33~0.38 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | 0.15~0.30 |
| SCM 440TK | 0.38~0.43 | 0.15~0.35 | 0.60~0.85 | 0.030 | 0.030 | 0.90~1.20 | 0.15~0.30 |
| Note: 1. Ni as an impurity in various steel pipes does not exceed 0.25%, and Cu does not exceed 0.30%; 2. When the purchaser requests the analysis of the finished product, the allowable deviation is as specified in Table 3 of JIS G0321. | |||||||
Tolerance of OD and W.T
| Division | Tolerance on O.D | Tolerance on W.T | ||
| Class 1 | D<50m | ±0.5 mm | S<4mm | +0.6mm-0.5mm |
| 50mm≤D | ±1% | S≥4mm | +1% -12.5% | |
| Class 2 | D<50m | ±0.25mm | S<3mm | ±0.3mm |
| 50mm≤D | ±0.5% | S≥3mm | ±10% | |
| Class 3 | D<25m | ±0.12mm | S<2mm | ±0.15mm |
| 40mm>D≥25mm | ±0.15mm | |||
| 50mm>D≥40mm | ±0.18mm | S≥2mm | ±8% | |
| 60mm>D≥50mm | ±0.20mm | Notes: tolerance on each wall thickness shall be rounded off to one decimal place in accordance with rule a JIS Z 8401 | ||
| 70mm>D≥60mm | ±0.23mm | |||
| 80mm>D≥70mm | ±0.25mm | |||
| 90mm>D≥80mm | ±0.30mm | |||
| 100mm>D≥90mm | ±0.40mm | |||
| D≥100mm | ±0.50% | |||
| 1. The OD tolerance of hot finish seamless steel pipe according to Class1 2. Quenched and tempered steel pipes according to 4 categories. | ||||
Product Pictures:
![]()
![]()
Company Introduction:
![]()
Packaging and Delivery:
![]()
FAQ:
Q: Are you trading company or manufacturer?
A: We are a professional steel pipes materials manufacturer.
Q: How long is your delivery time?
A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.
Q: Do you provide free sampleas?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
#torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ... #torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ...
Get in touch with us
Leave a Message, we will call you back quickly!