| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability | 5000 Tons per Year |
| Delivery Time | 30 - 45 days |
| Packaging Details | In Bundle or Wooden Box. |
| Product name | Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater |
| Technique | Cold Drawn |
| Section shape | Round |
| Length | As Per Client Requested |
| Surface treatment | Oiled |
| Alloy or not | Non-alloy |
| Secondary or not | Non-secondary |
| Brand Name | Torich |
| Model Number | ASME SA210 |
| Certification | ISO |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
JIS G4105 SCM440 Alloy Steel Seamless Pipes for High Temperature Applications
ASTM A501 Gr.A Gr.B Seamless Carbon Steel Tube for Construction
ASTM A501 Seamless Carbon Steel Tube for Construction
20MnG High Pressure Boiler Tube Alloy Seamless Pipe For Boilers Heat Exchangers
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 5000 Tons per Year |
| Delivery Time | 30 - 45 days | Packaging Details | In Bundle or Wooden Box. |
| Product name | Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater | Technique | Cold Drawn |
| Section shape | Round | Length | As Per Client Requested |
| Surface treatment | Oiled | Alloy or not | Non-alloy |
| Secondary or not | Non-secondary | Brand Name | Torich |
| Model Number | ASME SA210 | Certification | ISO |
| Place of Origin | CHINA | ||
| High Light | ASME SA210 Seamless Steel Tubes ,Boiler Seamless Steel Tubes ,Superheater Seamless Steel Tubes | ||
Product Deacription
| Application | For boiler tubes, boiler flues and superheater tubes |
| O.D. | 12.7 - 127 mm |
| Min W.T. | 0.9 - 12.7 mm (Tolerance: +20%) |
| Length | As per client requested |
Chemical Composition
| Grade | C | Mn | P | S | Si |
| A-1 | ≤0.27 | ≤0.93 | ≤0.035 | ≤0.035 | ≥0.10 |
| C | ≤0.35 | 0.29-1.06 | ≤0.035 | ≤0.035 | ≥0.10 |
Mechanical properties
| Grade | Yield Point Mpa(ksi) | Tensile Strength Mpa(ksi) | Elongation |
| A-1 | ≥255(37) | ≥415(60) | ≥30% |
| C | ≥275(40) | ≥485(70) | ≥30% |
Product Picture
![]()
![]()
FAQ
Q: Are you trading company or manufacturer?
A: We are a professional steel pipes materials manufacturer.
Q: How long is your delivery time?
A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.
Q: Do you provide free sampleas?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Medium Carbon ASME SA210 Gr.A1 Gr.C Seamless Steel Tubes for Boiler and Superheater
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
#torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ... #torich-about-brief, #torich-about-brief * { box-sizing: border-box; } #torich-about-brief { --torich-red: #d71920; --torich-dark: #222a31; --torich-text: #4f5962; --torich-muted: #77818a; --torich-line: #e7eaed; --torich-soft: #f6f7f8; width: 100%; color: var(--torich-text); ...
Get in touch with us
Leave a Message, we will call you back quickly!