| Payment Terms | L/C, D/A, D/P, T/T, Western Union, |
| Supply Ability | 500 Tons Per Month |
| Delivery Time | 4-6 Weeks |
| Packaging Details | In bundles |
| Brand Name | TORICH |
| Model Number | ASTM A519 |
| Certification | ISO 9001 |
| Place of Origin | Zhejiang China |
View Detail Information
Explore similar products
Heavy Wall Carbon Steel Cold Drawn Seamless Tube for Mechanical Equipment
YB/T 4173 Forged And Bored Seamless Steel Pipes Heavy Wall For High Temperature
DIN EN 10210-1 Hot Finished Heavy Wall Steel Tubing , Thick Wall Steel Pipe
Seamless Heavy Wall Steel Tubing A333/A333M Gr1 , Gr2 , Gr3, Gr4, Gr 5, Gr6
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T, Western Union, | Supply Ability | 500 Tons Per Month |
| Delivery Time | 4-6 Weeks | Packaging Details | In bundles |
| Brand Name | TORICH | Model Number | ASTM A519 |
| Certification | ISO 9001 | Place of Origin | Zhejiang China |
| High Light | od16mm cold rolled steel pipe ,st37.4 cold rolled steel pipe ,A519 Cold Rolled Steel Pipe | ||
ST37.4 HIGH PRECISION COLD ROLLED SEAMLESS CARBON STEEL PIPE OD 16MM TUBING
ST37.4 Carbon Seamless Steel Pipe Tube
| Chemical Composition(%) | Mechanical Property | |||||||||
| C | Si | Mn | S | P | Cr | Ni | Cu | Mo | Yield Strength | Tensile Strength |
| ( σs ) | ( σb ) | |||||||||
| 0.08~0.13 | 0.15-0.35 | 0.30~0.60 | ≤0.050 | ≤0.040 | ≤0.20 | ≤0.25 | ≤0.25 | - | ≥205(21) (MPa) | ≥335(35) |
| (MPa) | ||||||||||
| End Shape | Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements | |||||||||
| Surface | Oiled, Galvanized, Phosphate etc | |||||||||
| Treatment | ||||||||||
| Technique | Cold drawn | |||||||||
| Application | 1. Automotive and mechanical pipes | |||||||||
| 2. Petroleum cracking pipes | ||||||||||
| 3. High Pressure Boiler Pipe | ||||||||||
| 4. Low and middle pressure fluid transportation pipeline | ||||||||||
| 5. Chemical fertilizer equipment pipes | ||||||||||
| 6. Heat exchanger pipes | ||||||||||
| Delivery | 1. BK (+C) | No heat treatment after last cold forming process. | ||||||||
| Conditions | 2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | ||||||||
| 3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |||||||||
| 4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |||||||||
| 5. NBK (+N) | After the final cold forming process the tubes are annealed above the upper transformation point in acontrolled atmosphere. | |||||||||
| Package | 1. Bundle Packing. | |||||||||
| 2. Plain end or vanished as per customer's request. | ||||||||||
| 3. Wrapped in waterproof paper. | ||||||||||
| 4. Sackcloth with several steel strips. | ||||||||||
| 5. Pack in heavy tri-wall boxes. | ||||||||||
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller
Year Established:
1997
Total Annual:
25000000-30000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat... Company Overview A Professional Steel Tube Manufacturer and Solution Provider TORICH INTERNATIONAL LIMITED integrates steel tube manufacturing, international trade, warehousing, technical support and customized processing. Our manufacturing operations cover cold drawing, cold rolling, heat treat...
Get in touch with us
Leave a Message, we will call you back quickly!