China factories

Chat Now Send Email
China factory - TORICH INTERNATIONAL LIMITED

TORICH INTERNATIONAL LIMITED

  • China,Ningbo ,Zhejiang
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness
China Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness

  1. China Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness
  2. China Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness
  3. China Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness
  4. China Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness

Brown Fintube Hairpin Heat Exchanger Aisi Embedded Fin Tube 1mm Thickness

  1. MOQ: 1 Ton
  2. Price: USD 1500-2000 Per Ton
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 500 Tons Per Month
Delivery Time 4-6 Weeks
Packaging Details In bundles
Type Seamless,Welded
Application Heat Exchanger
Standard ASTM,JIS,AISI,DIN,EN
Thickness 1mm-40mm
Outer diameter 6-630mm
Technique Cold drawn
Brand Name TORICH
Model Number Brown Fintube
Certification ISO
Place of Origin Zhejiang China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 500 Tons Per Month
Delivery Time 4-6 Weeks Packaging Details In bundles
Type Seamless,Welded Application Heat Exchanger
Standard ASTM,JIS,AISI,DIN,EN Thickness 1mm-40mm
Outer diameter 6-630mm Technique Cold drawn
Brand Name TORICH Model Number Brown Fintube
Certification ISO Place of Origin Zhejiang China
High Light brown fintube hairpin heat exchanger tubesaisi embedded fin tube1mm thickness embedded fin tube

Brown Fintube Hairpin Heat Exchanger Brown Fintube Embedded Finned Tube

 

Embedded finned tube production line equipment is successfully manufactured after many years

of experience and practice, and has successively entered the market. The equipment is upgraded

with reference to the advanced technology of British embedded finned tube equipment. PLC control

mode is developed according to domestic production requirements, simple operation - processing -

complete supporting facilities, and the products produced can be comparable with advanced  equipment

 

Inlaid spiral finned pipe is to pre process a spiral groove with a certain width and depth on the steel pipe,

and then inlay the steel strip on the steel pipe on the lathe. In the winding process, due to a certain preload,

the steel strip will be tightly tied in the spiral groove, so as to ensure a certain contact area between the steel

strip and the steel pipe. In order to prevent the steel strip from springback and falling off, both ends of the steel

strip shall be welded on the steel pipe. In order to facilitate inlay, there shall be a certain side gap between the

steel strip and the spiral groove. If the side clearance is too small to form interference, the mosaic process is difficult

to proceed smoothly. In addition, the wound steel strip always has a certain rebound, which makes the steel strip

and the bottom surface of the spiral groove can not be well connected.

 

Product processing requirements for embedded spiral finned tube (embedded) equipment

 

1 mosaic depth and stability

 

1.1 pull off force test: more than 8kg or aluminum strip tearing

 

1.2 inlay depth: 0.35 ~ 0.5, according to the wall thickness of furnace tube

 

1.3 inlay stability: the pull-out force sample of the first piece in each shift meets the requirements of 1.1

 

1.4 the embedded pipe shall be made of stainless steel and carbon steel, and the wall thickness of the pipe shall

not be less than 2mm

 

1.5 diameter of embedded pipe DN20 ~ 38 (British American standard according to 1.5 requirements)

 

1.6 there is no crack or crack on the surface of the pipe after embedding

 

1.7 the height of the inlaid piece shall be calculated according to the pipe diameter - generally half the pipe diameter,

but not higher than 57 mm

 

2 product dimensional accuracy

 

2.1 the total length of wing segment is - 5mm ~ + 5mm, and the segment motion accuracy is - 0.3mm ~ + 0.4mm

 

2.2 slice spacing + 0.21mm or more

 

2.3 perpendicularity of fins and steel pipes - 1 degree to + 1 degree

 

2.4 the inlay flatness is -0.1mm ~ + 0.1mm, except for the height difference caused by the thickness tolerance of the fin itself

 

2.5 inlay height difference - 0.1mm ~ + 0.1mm, except the height difference caused by the dimensional tolerance of the fin itself

 

2.6 under the conditions of the same steel pipe material, the same pitch and number of fins, the length of different finned tubes

changes the same after inlaying

 

3 mosaic speed

 

The outer diameter of the base pipe is 20 ~ 50 according to the pipe diameter and sheet spacing

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Importer,Exporter,Trading Company,Seller

  • Year Established:

    1997

  • Total Annual:

    25000000-30000000

  • Employee Number:

    100~200

  • Ecer Certification:

    Verified Supplier

Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ... Who We are ? -------A professional steel pipes materials inventor, manufacturer and solution providerTorich International Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the ...

+ Read More

Get in touch with us

  • Reach Us
  • TORICH INTERNATIONAL LIMITED
  • Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
  • https://www.precision-steeltube.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement