Payment Terms | L/C, T/T |
Supply Ability | 5000 Sets/Month |
Delivery Time | 7-14 Workdays |
Packaging Details | Plywood Box |
Keywords | Cleanroom Air Shower |
Material | Color Plate |
Voltage | 120V |
Condition | New |
Filter Efficiency | 99.99%@0.3μm |
Filter Efficiency Level | G3 |
Brand Name | GCC |
Model Number | AS |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
High Efficiency Filtration 2800R/min AC380V Air Shower Unit
CE Approved Automatic AC230V Cleanroom Air Shower Booth
SUS304 120Volt Entrance Cleanroom Air Shower
One Person H1910mm Stainless Steel Air Shower System
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 5000 Sets/Month |
Delivery Time | 7-14 Workdays | Packaging Details | Plywood Box |
Keywords | Cleanroom Air Shower | Material | Color Plate |
Voltage | 120V | Condition | New |
Filter Efficiency | 99.99%@0.3μm | Filter Efficiency Level | G3 |
Brand Name | GCC | Model Number | AS |
Certification | CE | Place of Origin | China |
High Light | 120Volt Cleanroom Air Shower ,120Volt filter air shower ,120Volt clean room shower |
Cleanrooms are required to adhere to strict regulatory guidelines to prevent contamination. Generally, people wear Coveralls or other protective gear before entering a cleanroom to prevent outside contaminants from , but that isn’t always enough.
As contaminants are easily transported by people and objects, which could cause issues in some cleanroom environments. Therefore, cleanroom air showers have become a vital component in maintaining the cleanliness of cleanrooms and other clean-critical environments.
Cleanroom air showers are enclosed chambers placed at the entry and exit points of a cleanroom or other controlled environment. Cleanroom air showers use high-velocity jets of air and HEPA or ULPA air filter systems to make air at velocities of 3,000 to 7,000 feet-per-minute (FPM), continuously streams from the jet nozzles for 30–45 seconds that remove loose contaminants from people and products when they pass it. Particle-laden, contaminated air is routed out of the shower compartment through floor vents and returned to the filtration unit. This process can filter the particles in the air and keep the cleanliness.
Major Component
1. LPC Bpard-1pc
2. LED Lamp-1pc
3. Blower-1pc
4. Nozzle-12pcs
5. HEPA Filter-1pc
6. Pre Filter-1pc
Technological Parameters:
Item | GCC-AS-1000 |
Material | Stainless Steel |
Internal Size | 790*860*1910mm |
External Size | 1200*1000*2050mm |
Efficiency | 99.99%@0.3μm,G3 |
Voltage & Power | 220V/50Hz/750W |
Air Volume | 1200m³/h |
Fan Rotate Speed | 2800R/min |
Wind Speed | ≥25-30m/s |
Showering Time | 0-99s( adjustable) |
Noise (The noise was measured from a meter away) | <62dB |
Remark | Can Be Customized |
Consumable parts illustration
1: Pre-filter: each one should be replacement in each 6 month, but it can refresh no more three times.
2: HEPA air filter: each one should be replacement in each half and one years.
Service
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
10000000-20000000
Employee Number:
>100
Ecer Certification:
Verified Supplier
Guangzhou Cleanroom Constuction Co., Ltd. was established in 2010 and is a high-quality enterprise in China's cleanroom system engineering and equipment manufacturing. The company has been recognized as a high-tech enterprise and a "little giant" of technological innovation in Guangzho... Guangzhou Cleanroom Constuction Co., Ltd. was established in 2010 and is a high-quality enterprise in China's cleanroom system engineering and equipment manufacturing. The company has been recognized as a high-tech enterprise and a "little giant" of technological innovation in Guangzho...
Get in touch with us
Leave a Message, we will call you back quickly!