Payment Terms | T/T, L/C |
Supply Ability | 1000 Sets/Month |
Delivery Time | 14-30 Workdays |
Packaging Details | Plywood Box |
Keyword | Prefab Cleanroom |
Frame Material | Aluminum Profile, Stainless Steel Profile, Steel Profile |
Wall Material | Magnesium Sandwich Panel |
Video outgoing-inspectionv | Provided |
Machinery Test Report | Provided |
After-sales Service Provided | Online support |
Brand Name | GCC |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Aluminum Profile GMP Cleanroom , 0.45m/S Iso Class 8 Clean Room
100m2 18pcs FFU Modular Prefab Cleanroom Systems
Air Cleanliness Control 9pcs FFU 50m2 Pharmacy Clean Room
Steel Profile Frame ISO4 Class 10 Prefab Cleanroom / Aseptic Clean Room
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 1000 Sets/Month |
Delivery Time | 14-30 Workdays | Packaging Details | Plywood Box |
Keyword | Prefab Cleanroom | Frame Material | Aluminum Profile, Stainless Steel Profile, Steel Profile |
Wall Material | Magnesium Sandwich Panel | Video outgoing-inspectionv | Provided |
Machinery Test Report | Provided | After-sales Service Provided | Online support |
Brand Name | GCC | Certification | ISO |
Place of Origin | China | ||
High Light | 15m2 Prefab Cleanroom ,3pcs FFU Prefab Cleanroom ,3pcs FFU class 1k cleanroom |
Prefab cleanroom is to control the cleanliness and temperature & humidity of the atmosphere that products (such as silicon) contact, can make the products in a good environment of production and manufacturing, this space we call it clean room.
According to international practice, dust-free purification level mainly be decided according to the number of air particle diameter per cubic meter is greater than the standard number of particles.
That is the so-called no dust, is not 100% no dust, but control on a very tiny amounts of units. Of course accord with standard of dust particles in the standard relative to our common dust is very small..
Level Of Airborne Particulate Cleanliness In Prefab Cleanroom
Level | Maximum Particles/m3 | Equivalent | |||||
≥0.1 μm | ≥0.2 μm | ≥0.3 μm | ≥0.5 μm | ≥1 μm | ≥5 μm | ||
ISO 1 | 10b | d | d | d | d | e | |
ISO 2 | 100 | 24b | 10b | d | d | e | |
ISO 3 | 1000 | 237 | 102 | 35b | d | e | Class 1 |
ISO 4 | 10000 | 2370 | 1020 | 352 | 83b | e | Class 10 |
ISO 5 | 100000 | 23700 | 10200 | 3520 | 832 | d,e,f | Class 100 |
ISO 6 | 1000000 | 237000 | 102000 | 35200 | 8320 | 293 | Class 1,000 |
ISO 7 | c | c | c | 352000 | 83200 | 2930 | Class 10,000 |
ISO 8 | c | c | c | 3520000 | 832000 | 29300 | Class 100,000 |
ISO 9 | c | c | c | 35200000 | 8320000 | 293000 | Room Air |
Area | 15㎡ | 30㎡ | 50㎡ | 100㎡ |
Material | Aluminum frame/Baking steel plate/lnsulating glass window | |||
FFU class 1-100 | 12pcs | 24pcs | 48pcs | 96pcs |
FFU class-1K | 3pcs | 6pcs | 9pcs | 18pcs |
FFU class-10K | 2pcs | 4pcs | 6pcs | 12pcs |
Speed (m/s) | 0.45m/s ±20% | 0.45m/s ±20% | ||
Temperature (optional) | 18-28°C | |||
Humidity (opiional) | 50-70% | 50-70% | ||
Illumination | 400-800LUX | |||
Power | 2.4-7kw | 4.8-10kw | 9.6-19kw | 19.2-30kw |
Application Industry
GCC prefab cleanroom projects cover in pharmaceutical plants, laboratories, testing centers, dust free production workshops, precision machinery industry, hospitals, electronics factories, semiconductor factories, microelectronics workshops, electrical appliances workshops, etc.
Our Advantage
We focus on all kinds of solutions for prefab cleanroom. If you are unsure of what tpye of prefab cleanroom you may need for your particular project, please feel free to contact us. We will provide a best solution according to your requirement.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
10000000-20000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. Qualifications and Honors: It is a ... Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. Qualifications and Honors: It is a ...
Get in touch with us
Leave a Message, we will call you back quickly!