China factories

Chat Now Send Email
China factory - Guangzhou Cleanroom Construction Co., Ltd.

Guangzhou Cleanroom Construction Co., Ltd.

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Fully Auto Control 4 People Clean Room Entrance / Air Shower System
China Fully Auto Control 4 People Clean Room Entrance / Air Shower System

  1. China Fully Auto Control 4 People Clean Room Entrance / Air Shower System

Fully Auto Control 4 People Clean Room Entrance / Air Shower System

  1. MOQ: 1 Set
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 50000 Sets/Month
Delivery Time 7-14 Workdays
Packaging Details Plywood Box
Key Word Cleanroom Air Shower Room
Material Metal
Function Air Filtration
Filter Efficiency 99.99%@0.3μm, G3
Usag Clean Room Entrance
Applicable Industries Manufacturing Plant, Food & Beverage Factory
Brand Name GCC
Model Number AS
Certification CE
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 50000 Sets/Month
Delivery Time 7-14 Workdays Packaging Details Plywood Box
Key Word Cleanroom Air Shower Room Material Metal
Function Air Filtration Filter Efficiency 99.99%@0.3μm, G3
Usag Clean Room Entrance Applicable Industries Manufacturing Plant, Food & Beverage Factory
Brand Name GCC Model Number AS
Certification CE Place of Origin China
High Light 4 People Clean Room EntranceFully Auto Control Clean Room Entrance4 People Air Shower System

Cleanroom Entrance With Air Filtration System

Cleanroom air shower are generally constructed from cleanroom-compatible steel or plastic materials and feature electronically-powered blowers, filters and high-pressure jet nozzles, they all being incorporated into the walls. Air, at velocities of 3,000 to 7,000 feet-per-minute (FPM), continuously streams from the jet nozzles for 30–45 seconds. Personnel inside the enclosure will lift their arms and turn their bodies for uniform exposure to the air streams, a procedure usually specified in protocol. Air currents from the jets create shearing and flapping forces, which lift and remove contaminants from both flat surfaces and the creases of garments. This process effectively removing 99.97% loose particulate matter form cleanroom air shower which particles greater than 0.3 µm diameter.

 

Features


1. Fully auto controlled by computer, 2 mechanical interlocking door, automatically blow and shower.
2. Duration for showering can be adjusted from 0 second to 99 seconds with time showed on LPC board.
3. Made of steel.
4. Efficiency can reach 99.99%@0.3μm with Pre filter and Hepa filter.
5. Air velocity can up to 25·30m/s.
6. OEM is acceptable.

 

Parameter

 

Item GCC-AS-1000 GCC-AS-2000 GCC-AS-3000
Size Internal Size L1000*W1200*H2050mm L2000*W1200*H2050mm L3000*W1200*H2050mm
External Size L860*W790*H1910mm L1860*W790*H1910mm L2860*W790*H1910mm
Capacity 1-2 people 2-4 people 3-6 people
Nozzle Quantity 12pcs 24pcs 36pcs
Wind Speed ≥25~30m/s
Noise <62dB
Blower Quantity 1pc 2pcs 3pcs
Revolution Speed 2800r/min
Hepa- Filter Quantity 1pc 2pcs 3pcs
Air Flow 1000m³/h
Efficiency 99.99%@0.3μm
initial resistance <220pa
Pre- Filter Quantity 1pc 2pcs 3pcs
Efficiency 85%@02μm
initial resistance <30pa
Voltage, Power 220V/50Hz,750W

 

Major Components


a. LPC Bpard-1pc                  b. LED Lamp-1pc
c. Blower-1pc                         d. Nozzle-12pcs
e. HEPA Filter-1pc                  f.  Pre Filter-1pc

 

Consumable Parts Illustration

 

1. Pre-filter: each one should be replacement in each 6 month, but it can refresh no more three times.

2. HEPA air filter: each one should be replacement in each half and one years.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    10000000-20000000

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. ​Qualifications and Honors: It is a ... Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. ​Qualifications and Honors: It is a ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Cleanroom Construction Co., Ltd.
  • 102, Building 4, No. 23 Yongfeng Road, Yongshan Village, Shiqi Town, Panyu District, Guangzhou City, Guangdong Province
  • https://www.prefabcleanroom.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement