Payment Terms | T/T, |
Delivery Time | 7-14 Workdays |
Packaging Details | Plywood Box |
Keyword | pressure steam sterilizer autoclave |
Type | portable vertical |
Style | sterilizer autoclave |
Material | stainless steel |
Function | sterilization |
After-sales service provided | Online support |
Brand Name | GCC |
Model Number | HLCB |
Certification | CE,ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Color Cold Rolled Steel Laboratory Storage Cabinets Lab Room Equipment
5 Layers 1.0mm Steel Lab Cabinets Lab Room Equipment
GCC Automatic Shoe Sole Cleaning Machine For Food Industry Cleanroom
Automatic Cleaning Odorless 304 Stainless Steel Negative Pressure Dissection
Product Specification
Payment Terms | T/T, | Delivery Time | 7-14 Workdays |
Packaging Details | Plywood Box | Keyword | pressure steam sterilizer autoclave |
Type | portable vertical | Style | sterilizer autoclave |
Material | stainless steel | Function | sterilization |
After-sales service provided | Online support | Brand Name | GCC |
Model Number | HLCB | Certification | CE,ISO |
Place of Origin | China | ||
High Light | Vertical Pressure Steam Autoclave Sterilizer ,Lab Steam Autoclave Sterilizer ,Stainless Steel Steam Autoclave Sterilizer |
Vertical Pressure Steam Autoclave Sterilizer For Lab
1.Sterilization Work Process Description
1.1 Preparation
1)Open the lid of the container, take out the drums and add water manually till it reach the high level. (Use distilled water)
2) Turn on the power and turn on the power break switch.
3) Standby indicator light is on. The high water level indicator lights up.
4) After piling the items, place them on a sieve plate sequentially, and leave some appropriate gaps between the packages. We suggest to make the packages into 20cm x 20cm x 10cm. The dressing and the textile should not be tightly packed. And don’t forget to place the sterilizing indicator.
5) After placing the drum in the container, close the and clockwisely tighten the hand wheel till the lid is closed. Don’t close too tight as which might bring damage to the rubber gasket.
6) Set sterilization parameters (see parameter settings for details).
The Sterilizing time can be set by the followed table 2, please set the sterilizing time and temperature according to different item required.
CHARACTERISTICS
(corresponding to a saturated steam temperature of 115 to 134°C).
sterilization pressure exceeds the maximum allowable value.
lower than the specified water level line, the sterilizer automatically cuts off the heating power and alarms at the same time.
Parameters
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
10000000-20000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. Qualifications and Honors: It is a ... Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. Qualifications and Honors: It is a ...
Get in touch with us
Leave a Message, we will call you back quickly!