China factories

Chat Now Send Email
China factory - Guangzhou Cleanroom Construction Co., Ltd.

Guangzhou Cleanroom Construction Co., Ltd.

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Maintaining Airflow and Pressure Control Laminar Flow Hood
China Maintaining Airflow and Pressure Control Laminar Flow Hood

  1. China Maintaining Airflow and Pressure Control Laminar Flow Hood
  2. China Maintaining Airflow and Pressure Control Laminar Flow Hood
  3. China Maintaining Airflow and Pressure Control Laminar Flow Hood
  4. China Maintaining Airflow and Pressure Control Laminar Flow Hood

Maintaining Airflow and Pressure Control Laminar Flow Hood

  1. MOQ: 1
  2. Price: 1800$
  3. Get Latest Price
Payment Terms T/T
Supply Ability Manufacturer
Delivery Time 10-14
Packaging Details Wooden Box
Product name Laminar Flow Hood
Material Stainless Steel
Function Contamination Control
Usage Particle Filtration
Feature Durability and Longevity
Advantage Maintaining Airflow and Pressure Control
Applicable Industries Manufacturing Plant
Video outgoing-inspection Provided
Brand Name GCC
Model Number GCC-FG-1000
Certification ISO9001,ISO14001,ISO45001,CE
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability Manufacturer
Delivery Time 10-14 Packaging Details Wooden Box
Product name Laminar Flow Hood Material Stainless Steel
Function Contamination Control Usage Particle Filtration
Feature Durability and Longevity Advantage Maintaining Airflow and Pressure Control
Applicable Industries Manufacturing Plant Video outgoing-inspection Provided
Brand Name GCC Model Number GCC-FG-1000
Certification ISO9001,ISO14001,ISO45001,CE Place of Origin China
High Light Pressure Control Laminar Flow HoodStainless Steel Laminar Flow Hood

Product Name: Laminar Flow Hood
Dimensions: 18009002600 (mm)
Cleanliness Level: Static Class 100 @ 0.3um (US Federal Standard)
Cabinet Material: SUS304 Stainless Steel
Average Face Velocity: 0.25~0.55m/s (adjustable in three levels), recommended 0.35m/s
HEPA Filters: 2 pcs, 78969369 (mm), efficiency 99.995%@≥0.3μm
Medium Efficiency Filters: 4 pcs, 75025021, efficiency 45%@≥0.5μm
Pre-filters: 4 pcs, 75025017, efficiency 40%@≥2.0μm
Note: Pre-filters should be replaced every 1-3 months, medium efficiency filters every 3-6 months, and HEPA filters generally
every year.
Replacement Guidelines:
* HEPA filters must be replaced when the differential pressure reaches 400Pa.
* Pre-filters must be replaced or cleaned when the differential pressure reaches 50Pa.
* Medium efficiency filters must be replaced or cleaned when the differential pressure reaches 80Pa.
Noise Level: ≤65db
Power Supply: 220VAC, 50HZ, 550W (excluding power consumption of sockets)

Key Features:

No Item Detail
1 Cleanliness Level Static Class 100 @ 0.3um (US Federal Standard)
2 Cabinet Material SUS304 Stainless Steel
3 Average Face Velocity 0.25~0.55m/s (adjustable in three levels), recommended 0.35m/s
4 HEPA Filters 2 pcs, 78969369 (mm), efficiency 99.995%@≥0.3μm
5 Medium Efficiency Filters 4 pcs, 75025021, efficiency 45%@≥0.5μm
6 Pre-filters 4 pcs, 75025017, efficiency 40%@≥2.0μm
7 Size(W*D*H)MM
1300*1200*600/1500*1200*600/2400*1200*600/2280*1460*500/1530*1060*500/1160*775*500
8 Note Pre-filters should be replaced every 1-3 months, medium efficiency filters every 3-6 months, and HEPA filters generally every year.

Replacement Guidelines:

* HEPA filters must be replaced when the differential pressure reaches 400Pa.
* Pre-filters must be replaced or cleaned when the differential pressure reaches 50Pa.
* Medium efficiency filters must be replaced or cleaned when the differential pressure reaches 80Pa.
Noise Level: ≤65db
Power Supply: 220VAC, 50HZ, 550W (excluding power consumption of sockets)

FAQ:

Q1:Are you a manufacturer or a trader? Where is your factory? A1: We are a professional Purification Equipment manufacturer with a professional team of designers and engineers. Our factory is located in Guangzhou, China.
Q2:What is your delivery time? A2: It will take 10-15 days after receiving your prepayment. The specific delivery time depends on your order quantity.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    10000000-20000000

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. ​Qualifications and Honors: It is a ... Establishment & Vision: Guangzhou Cleanroom Construction Co., Ltd. was founded in 2010 and is committed to becoming a one-stop cleanroom construction and solutions partner for customers, contributing to the development of the global cleanroom industry. ​Qualifications and Honors: It is a ...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Cleanroom Construction Co., Ltd.
  • 102, Building 4, No. 23 Yongfeng Road, Yongshan Village, Shiqi Town, Panyu District, Guangzhou City, Guangdong Province
  • https://www.prefabcleanroom.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement