China factories

China factory - Shenyang iBeehive Technology Co., LTD.

Shenyang iBeehive Technology Co., LTD.

  • China,Shenyang ,Liaoning
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door
China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door

  1. China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door
  2. China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door
  3. China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door
  4. China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door
  5. China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door
  6. China Prefabricated Workshop Steel Structure Aluminium Window Rolling Door

Prefabricated Workshop Steel Structure Aluminium Window Rolling Door

  1. MOQ: 1000 square meter
  2. Price: Usd29-49square meter
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 50000tons per year
Delivery Time 23 work days
Packaging Details Well packed, palleted and loaded into 20ft 40ft ship container for prefabricated steel warehouse flat pack packing.
Product name Steel structure warehouse
Material A36)ASTM (Q235B/Q345B)GB S355JR(EN)
Main frame Welded H Steel Beam, Steel Truss
Secondary frame C&Z Purlin, Brace
Wall Cladding Steel color sheet, sandwich panel
Roof Cladding Steel color sheet, sandwich panel glass wool and mesh
Window Sliding Window, PVC window or aluminium window
Door sliding door or rolling door
Surface treatment Hot Dip Galvanized and Painted
Performance Safety, water-proof, sound insulated hear-preservation etc.
Brand Name ibeehive
Certification ISO AWS
Place of Origin Shenyang

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 50000tons per year
Delivery Time 23 work days Packaging Details Well packed, palleted and loaded into 20ft 40ft ship container for prefabricated steel warehouse flat pack packing.
Product name Steel structure warehouse Material A36)ASTM (Q235B/Q345B)GB S355JR(EN)
Main frame Welded H Steel Beam, Steel Truss Secondary frame C&Z Purlin, Brace
Wall Cladding Steel color sheet, sandwich panel Roof Cladding Steel color sheet, sandwich panel glass wool and mesh
Window Sliding Window, PVC window or aluminium window Door sliding door or rolling door
Surface treatment Hot Dip Galvanized and Painted Performance Safety, water-proof, sound insulated hear-preservation etc.
Brand Name ibeehive Certification ISO AWS
Place of Origin Shenyang
High Light steel frame workshop buildingsstructural steel workshop

Prefabricated Workshop Steel Structure Aluminium Window Rolling Door

 

 

STEEL WORKSHOP

Features

1. High material strength and lightweight

2. Steel toughness, good plasticity, uniform material, high structural reliability

3. The degree of mechanization of steel structure manufacturing and installation is high

4. The steel structure sealing performance is good

5. The steel structure is heat resistant and not fire resistant

6. The steel structure is poor corrosion resistance

7. Low carbon, energy saving, green and environmentally friendly, reusable

PROJECT CASES

 

International Automobile Research and Development Park No. 2.

Steel amount:7000tons.
Type: warehouse
Project time: 2018
Project location: Shenyang
Quantity:55000Sqm

Prefab Steel food warehouse for Ghana.

Project size:16538.80Sqm
Steel Structure Quantity: 496.2tons
Dead Loading:0.4KN/m2
Live loading:0.5KN/m2
Wind load: 0.45kn/m2

 

 

Prefab Steel Workshop for Pakistan.

Project size:7062.90Sqm
Steel Structure Quantity: 277.9tons
Dead Loading:0.3KN/m2
Live loading:0.5KN/m2
Wind load: 0.55kn/m2

 

PRODUCT DESCRIPTION

Main frame steel Steel Welded H Section or hot rolled H section
Purlin C or Z Section Channel for roof and wall
Cladding system Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool for wall and roof
Tie Rod Circular Steel Tube
Brace Round Bar
Column & Transverse Angle Steel or H Section Steel or Steel Pipe
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Rainspout PVC Pipe
Door Sliding Sandwich Panel Door or Metal Door
Windows PVC/Plastic Steel/Aluminum Alloy Window
Connecting High Strength Bolts
Main steel material Q345, Q235, Q345B, Q235B,Q355 etc
Packing Decided by you , loaded into 1X 40ft GP,1X20 ft GP,1X40 ft HQ
Drawing We can make the design and quotation according to your require or you
Crane Decided by you

STEEL STRUCTURE TYPE.

Single span, double span, multi span, single slope, double slope, multi slope etc.

WE CAN PROVIDE

1. Customized design will be provide with free

We can design complex industrial building for clients by using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc.

2. Steel Structure Building Manufacturing Process:

3. We have many production lines and strong production capacity as follows:

 

2 fabrication factory tatol area 18000 Sqm!

5 heavy steel structure production lines!

1 assembly workshop that can assembly steel bridge!
Production capacity of steel structure components: 50000 tons per year
Total area of finished steel structure projects: 17600000 m2

We have enough strong production space and production capacity to delivery the goods on time.

4. Quality control.

 

General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering. For the welding,

We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to AWS welding quality system.

ATTEND EXHIBITION

CUSTOMER VISIT

GET THE BEST PREICE

Please kindly inform us information as below if you are interested our products.

 

Such as these questions:

1. Usage: _____ for warehouse,workshop, showroom etc.
2. Location (where will be built? ) _____country, area

3. Size: Length*width*height _____mm*_____mm*_____mm

4. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

5. Snow load (max. Snow height)_____kn/m2, _____mm

6. Anti-earthquake _____level

7. Brick wall needed or not If yes, 1.2m high or 1.5m high

8. Thermal insulation

If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested;
If not, the metal steel sheets will be OK.
The cost of the latter will be much lower than that of the former.

9. Door quantity & size _____units, _____(width)mm*_____(height)mm

10. Window quantity & size _____units, _____(width)mm*_____(height)mm

11. Crane needed or not If yes, _____units, max. Lifting weight____tons;
Max. Lifting height _____m.

 

FAQ

Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.

Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

 

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

 

Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years

 

Q5: What is the anti-rust treatment for steel structure?
A:Anti-rust treatment of steel structure
Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish
Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure

Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller

  • Year Established:

    2000

  • Total Annual:

    50000000-80000000

  • Employee Number:

    400~500

  • Ecer Certification:

    Verified Supplier

  iBeehive ENTERPRISE GROUP is one large and diversified private corporation, consisting of Liaoning iBeehive Construction Material Technology Co., LTD., Shenyang iBeehive Steel Structure Engineering Co., Ltd., Liaoning iBeehive Metal Structure Products Co. Ltd., and specializ...   iBeehive ENTERPRISE GROUP is one large and diversified private corporation, consisting of Liaoning iBeehive Construction Material Technology Co., LTD., Shenyang iBeehive Steel Structure Engineering Co., Ltd., Liaoning iBeehive Metal Structure Products Co. Ltd., and specializ...

+ Read More

Get in touch with us

  • Reach Us
  • Shenyang iBeehive Technology Co., LTD.
  • Room 202, D07 building SISP, Hunnan District, Shenyang
  • MrKevin
  • +8613842071447
  • https://www.prefabricatedsteelstructures.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement