Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100+ |
Delivery Time | 60-75 working days |
Packaging Details | Export standard |
Material | Sugarcane pulp, bamboo pulp, wood pulp, straw pulp |
Forming | Vacuum suction&thermalforming |
Drying | Dry in mold |
Drive | Servo |
Voltage | 220-440V |
Dimension | 4700*2000*2510mm |
Weight | 8564kg |
Capacity | 2000-10000pcs/h |
Certificate | CE,TUV,SGS |
Brand Name | NANYA |
Model Number | BY043 |
Certification | CE... |
Place of Origin | China |
View Detail Information
Explore similar products
Large Capacity Pulp Molding Equipment / Egg Tray Egg Carton Production Line
Automatic Biodegradable Bagasse Pulp Molding Equipment / Plate Making Machine
Hanging Transfer Pulp Molding Dryer / Egg Tray Drying Production Line
Automatic Virgin Pulp Molding Equipment Tableware Thermoforming Machine
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100+ |
Delivery Time | 60-75 working days | Packaging Details | Export standard |
Material | Sugarcane pulp, bamboo pulp, wood pulp, straw pulp | Forming | Vacuum suction&thermalforming |
Drying | Dry in mold | Drive | Servo |
Voltage | 220-440V | Dimension | 4700*2000*2510mm |
Weight | 8564kg | Capacity | 2000-10000pcs/h |
Certificate | CE,TUV,SGS | Brand Name | NANYA |
Model Number | BY043 | Certification | CE... |
Place of Origin | China | ||
High Light | Sugarcane pulp molding forming machine ,Fully Automatic Sugarcane Pulp Forming Machine |
Description
BY series automatic tableware production line is composed of pulping system, molding system, vacuum system, high pressure water system and air pressure system. Using sugarcane pulp, bamboo pulp, wood pulp, reed pulp, straw pulp and other pulp boards as raw materials, it can produce disposable pulp molded tableware. The raw material is prepared into a certain concentration of pulp by the process of shredding, grinding, adding chemical additives, etc., and then the pulp is uniformly attached to the customized mold to form a wet product through the vacuum effect,and drying is also done by the forming machine,after drying,the robot will transfers the product to the trimming machine.
Details:
Specifications:
Model Type | TA-01B | TA-02B | TA-05B | TA-10B |
Capacity | 1800pcs/h | 3500pcs/h | 6000pcs/h | 10000pcs/h |
Workshop Requirement | 200m2 | 230m2 | 600m2 | 1200 m2 |
Electricity Consumption | 120kw | 390kw | 550kw | 1100kw |
Electricity Installed | 200kw | 250kw | 880kw | 1700kw |
Material Consumption | 25~30kg/h | 50~60kg/h | 120~150kg/h | 250~300kg/h |
Water Consumption | 80~100kg/h | 150~200kg/h | 500~600kg/h | 1000~1200kg/h |
Worker Requirement | 3 persons | 4 persons | 6 persons | 10 persons |
Container Requirement for Shipment | 1 x 40’HQ | 2 x 40’HQ | 4 x 40’HQ | 8 x 40’HQ |
Forming Type | Vacuum suction, thermoforming | Vacuum suction, thermoforming | Vacuum suction, thermoforming | Vacuum suction, thermoforming |
Drying Method | Drying in mould | Drying in mould | Drying in mould | Drying in mould |
Notes:
|
Competitive Advantages:
Applications:
Food container | Dishware, tableware, lunch box, bowl, cup, clamshell… |
Artware | Mask, Christmas balls, Easter Eggs , boutiques… |
Disposable Medical Care Products | Bedpan, sick pad, female urinal… |
High quality packages | Mobile phone package, camera package,water bottle... |
![]() |
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms | 30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 75 days |
4 | Packages | Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation | Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
|
8 | Quotation Validity | 90 days after the offering date |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1994
Total Annual:
10Million-50Million
Employee Number:
300~400
Ecer Certification:
Verified Supplier
NANYA was set up in 1994 and now we have two production bases,covers over 40,000 square meters, now it’s one of the earliest and biggest pulp molding machines manufactures in China and becomes the leading pulp molding machinery supplier in the world. NANYA has more than 50 persons in R&... NANYA was set up in 1994 and now we have two production bases,covers over 40,000 square meters, now it’s one of the earliest and biggest pulp molding machines manufactures in China and becomes the leading pulp molding machinery supplier in the world. NANYA has more than 50 persons in R&...
Get in touch with us
Leave a Message, we will call you back quickly!