Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
20*10*20 (Unit not specified, recommended to add mm/cm)
Weight
1.5 (Unit not specified, recommended to add kg)
Warranty
1.5 Year
Maximum Flow Rate
60 L/min
Maximum Pressure
315 bar
Pressure
System Pressure / 315 bar
Power (W)
0.5 W
Structure
Inside
Showroom Location
None
Certification
3CE (Note: Standard certification is CE; confirm if it's a typo)
4WRZ16E100-7X/6EG24N9EK4/M
4WRZ16E1-100-7X/6EG24N9ETK4/M
4WRZ16E100-7X/6EG24N9K4/M
4WRZ16E100-7X/6EG24N9K4/D3M
4WRZ32W6A520-70/6EG24N9ETK4/M
4WRZ32EA520-70/6EG24N9ETK4/M
4WRZ32W6-520-70/6EG24N9TK4/D3M
4WRZ32EA360-70/6EG24N9EK4/M
4WRZ32W9-520-70/6EG24N9ETK4/M
4WRZ32W9-520-70/6EG24N9K4/M
4WRZ32W9-360-70/6EG24N9TK4/D3M
4WRZ32W9-360-70/6EG24N9ETK4/M
4WRZ32W9-360-70/6EG24N9K4/M
4WRZ32W8-520-70/6EG24N9TK4/D3M
4WRZ32W8-520-70/6EG24N9ETK4/M
4WRZ32W8-520-70/6EG24N9K4/M
4WRZ32W8-360-70/6EG24N9TK4/D3M
4WRZ32W8-360-70/6EG24N9ETK4/M
4WRZ32W8-360-70/6EG24N9K4/M
FAQ;
1. Installation & Commissioning
1.1 What are the critical installation guidelines?
Proper installation is essential for reliable operation. Adhere to Rexroth’s installation instructions and the following key points:
Mounting Location: Install in a well-ventilated area with easy access for maintenance. Avoid direct sunlight, high-temperature surfaces (e.g., exhaust manifolds), and areas prone to vibration or contamination.
Pipeline Preparation: Flush all hydraulic lines before connection to remove debris, rust, or machining residues. Use proper tube bending techniques to avoid kinks that restrict flow.
Port Identification: Strictly follow port markings (P = supply, T = return, A/B = working ports) to prevent reverse flow, which can damage internal components.
Torque Specifications: Use a calibrated torque wrench to tighten flange bolts and tube fittings to the values specified in the manual (typically 25-35 N·m for flange bolts). Over-tightening may warp the valve body; under-tightening causes oil leaks.
Electrical Connection: Ensure the power supply matches the 24V DC rating. Use shielded cables for control signals to minimize electromagnetic interference (EMI). Ground the valve body and control cabinet per local electrical codes.
1.2 How to perform initial commissioning?
Commissioning should be conducted by qualified personnel after the hydraulic system is filled, bled, and pre-pressurized. Follow this step-by-step process:
Pre-Commissioning Check: Verify all mechanical and electrical connections are secure. Confirm the hydraulic oil level is within the recommended range and the oil is at operating temperature (20-40°C).
Power-On Verification: Apply power to the valve’s electronic amplifier. Check that the status LED (if equipped) illuminates steadily (no flashing, which indicates a fault).
Zero Adjustment: Apply a 0% control signal (0 mA). The connected actuator should remain stationary. If drift occurs, adjust the zero potentiometer (located on the amplifier) until movement stops.
Flow Characterization: Gradually increase the control signal from 0% to 100% (0-800 mA) and observe the actuator’s speed. It should increase smoothly and linearly. Note any irregularities (e.g., jerking, sudden speed changes) for further troubleshooting.
Load Testing: Apply rated load to the actuator and repeat the flow characterization. Confirm that speed consistency is maintained (pressure compensation function test).
Emergency Stop Test: Activate the system’s emergency stop to ensure the valve returns to the neutral position immediately, stopping the actuator.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer
Year Established:
2015
Total Annual:
2000000-5000000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Xiamen Lang Ye Hydraulic Electromechanical Equipment Co., Ltd.Lang Ye Hydraulic is the excellent supplier of hydraulic gear pump, HPU, hydraulic control valve, orbital motor and so on. We offer integrated R& D, production and sales service. We have our own self built R&D laboratory and a num... Xiamen Lang Ye Hydraulic Electromechanical Equipment Co., Ltd.Lang Ye Hydraulic is the excellent supplier of hydraulic gear pump, HPU, hydraulic control valve, orbital motor and so on. We offer integrated R& D, production and sales service. We have our own self built R&D laboratory and a num...